杭州市余杭区文一西路至瓶仓大道供水管道工程监理规划

申明敬告: 本站不保证该用户上传的文档完整性,不预览、不比对内容而直接下载产生的反悔问题本站不予受理。

文档介绍

杭州市余杭区文一西路至瓶仓大道供水管道工程监理规划

杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划编制人:于远东批准人:杨克顺杭州南越工程项目管理有限公司二零一零年七月ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划目录1、工程项目概况………………………………………………………………………52、监理工作范围………………………………………………………………………63、监理工作内容………………………………………………………………………64、监理工作依据………………………………………………………………………85、监理工作目标………………………………………………………………………86、监理机构组织形式与人员配备…………………………………………………107、监理机构人员岗位职责7.1、总监理工程师岗位职责………………………………………………………117.2、专业监理工程师职责…………………………………………………………127.3、安全监理工程师职责…………………………………………………………127.4、监理员岗位职责………………………………………………………………137.5、安全监理员岗位职责…………………………………………………………138、监理设施………………………………………………………………………139、工程质量控制9.1、工程质量控制的内容…………………………………………………………159.2、工程质量控制工作原则………………………………………………………169.3、工程质量控制的基本程序……………………………………………………169.4、工程质量方法及措施…………………………………………………………209.5、见证取样监理控制内容、工作原则、措施…………………………………219.6、旁站监理控制内容、工作原则、措施………………………………………229.7、供水管道工程监理质量控制…………………………………………………2510、工程进度控制10.1、进度控制的内容……………………………………………………………4710.2、进度控制的基本程序………………………………………………………4810.3、进度控制的措施……………………………………………………………4811、工程投资控制11.1、投资控制的内容……………………………………………………………5011.2、投资控制的原则………………………………………………………………52ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划11.3、投资控制的基本程序…………………………………………………………5311.4、投资控制的措施………………………………………………………………5412、安全与文明管理12.1、安全与文明施工监理原则…………………………………………………5612.2、安全与文明施工监理的主要内容…………………………………………5612.3、安全管理(环境保护)监理工作程序……………………………………6012.4、安全与文明(环境保护)监理措施………………………………………6112.5.安全与文明施工监理方法……………………………………………………6113、合同管理13.1工程合同管理的内容…………………………………………………………6213.2合同管理的原则………………………………………………………………6213.3合同管理的程序………………………………………………………………6313.4合同管理的措施………………………………………………………………6414、组织协调14.1组织协调工作内容……………………………………………………………6514.2组织协调工作的重点……………………………………………………………6614.3协调工作的方法…………………………………………………………………6614.4协调工作的建议…………………………………………………………………6815、监理工作制度15.1设计交底与施工图纸会审制度…………………………………………………6915.2施工组织设计(方案)审核制度………………………………………………6915.3工程开工申请制度……………………………………………………………7115.4工程材料、成品、半成品质量检验制度………………………………………7115.5隐蔽工程、检验批、分项、分部工程质量验收制度…………………………7115.6工程变更复核签审制度…………………………………………………………7115.7工程质量事故处理制度…………………………………………………………7215.8施工进度监督及报告制度………………………………………………………7215.9监理报告制度……………………………………………………………………7315.10工程例会及会议纪要签发制度………………………………………………73ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划15.11竣工预验制度…………………………………………………………………7415.12项目监理内部工作制度………………………………………………………74附表: 项目监理部管理职能分配表………………………………………………75 1、工程概况1.1工程名称:余杭区文一西路至瓶仓大道D80供水管道应急工程ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划1.2建设单位:杭州余杭水务有限公司1.3设计单位:泛华建设集团有限公司1.4监理单位:杭州南越工程项目管理公司1.5施工单位:杭州路桥有限公司、杭州天下建设有限公司1.6工程地点:杭州市余杭区东西大道1.7工程规模:D80供水管道总计12.3公里1.8计划施工工期:90天1.9工程项目概况供水管道起点从东西大道与文一西路交叉路口开始,由东西大道南北向布线,末端为瓶仓大道。管道管径DN800,全长约12300M,沿途跨越一号河至十一号河共计11座管桥、余杭塘河倒虹吸管、(约75M)1座,穿越铁道段一处;砖砌检查井(蝶阀井)DN8002200×2200)10座,砖砌检查井(蝶阀井DN500Ф2000)3座,砖砌检查井(蝶阀井DN400Ф1800)2座,其它闸阀井、排气阀井等15座。2、监理服务的范围2.1工程服务范围:施工图范围内的管道挖填、钢管、水泥管安装、管桥、倒虹吸管施工等工程施工阶段监理服务。2.2工作服务范围:对于所辖施工标段的全部工程自施工准备期至交工验收前的质量控制、进度控制、造价控制、合同管理、信息管理和工作协调实施全面管理;对质量保修期内承包人实施的工程项目的未完成工作、缺陷修补与缺陷调查工作,提供监理服务。2.3监理服务期:按施工合同工期(从开工至竣工验收),不少于九90日历天,另加保修期。3、监理工作内容3.1协助业主审核施工图的设计和概(预)算,参加图纸会审,做好记录,写出会审纪要。3.2ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划参与业主与施工承包商签定施工承包合同,审核施工进度计划,并在实施过程中检查、督促承包商严格按合同和施工规范、工程技术标准、设计要求进行施工,监督承包商现场施工管理。3.3协助业主做好开工前准备,经业主同意签发开工令。3.4审批施工组织设计,审查和检查施工技术措施、质量保证体系及安全防护措施,提出合理的整改意见和建议。3.5督促承包商编制材料的供需计划,定期提供工程主材的供货清单。3.6对施工变更的签证,参加施工图交底,参与设计变更的签证,复核施工变更。3.7主持召开工程协调会议并做好会议纪要,调解有关工程建设各种合同争议,处理索赔事项。3.8检查督促施工单位贯彻执行国家相关安全法律、法规和杭州市有关部门对建筑安全的相关文件,检查安全防护措施和文明施工,检查督促工程进度、施工质量。3.9督促施工单位及时整理技术资料及竣工验收资料,直至业主委托专业审计单位出具审计报告为止。3.10协助业主对工程投资进行控制,对施工单位提出的付款申请进行审核。3.11参加审核工程决算,协助业主审核工程造价,努力降低工程费用。3.12及时提供完整的监理资料,定期编制监理简报。3.13履行其他法律、法规规定的监理职责义务,提供其他可免费提供的监理服务。3.14协助业主组织进行交工验收及竣工验收,负责保修阶段的工程状况,督促施工承包方回访监督保修达到规定的质量要求。3.15完成监理规范要求的其他工作内容。4、监理工作依据4.1国家及省有关法律、法规、条例和规章。4.2国家及有关部门颁布的工程施工技术标准、规程、规范。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划4.3国家及有关部门颁布的工程安全生产管理条例4.4上级主管部门批准的项目可行性研究报告、设计文件和批文。4.5经审查的施工图纸、资料及说明。4.6工程施工承包合同及有关文件、附件及设计文件。4.7监理合同及有关文件。4.8业主提供的其它文件和资料。4.9监理工程师和承包人在工程实施过程中有关的会议记录、函电和其它文字记载,监理工程师发出的所有指令等也可作为监理依据的补充。5、监理工作的目标在整个监理过程中,我们将根据建设单位要求及所确定的范围,高标准、严要求,以国家的法律、法规、技术标准、规范、设计文件及合同文件为依据,对工程施工过程实施全方面的、专业齐全的、全环节、全天候的工程施工监理。充分运用合同管理、信息管理和全面的组织协调等手段,严格控制工程质量、工期和投资,确保安全生产、文明施工,监理服务工作真正做到科学、公正、守法、诚信,使工程按质按量完成,达到国家验评标准。工程竣工投入使用后,我单位将继续做好保修期的监理工作,并指定专人负责保修期限的监理工作。使监理工作真正做到善始善终、圆满完成。为业主提供优质、高效的服务。为此我们确定了如下详细监理工作目标:5.1质量控制目标确保该工程在合同工期内顺利进行,确保施工单位对工程质量承诺的实现,工程质量符合(工程施工质量验收规范)标准。在具体监理过程中,通过认真审查施工方案,督促施工单位从组织机构、技术措施上使整个工程质量处于“受控”ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划状态,紧紧抓住重要环节,坚持主动控制与被动控制相结合的原则,对工序质量实施事前、事中、事后的全过程、全方位跟踪监督和及时解决施工中存在的质量问题,确保工程按照国家强制性建筑规范标准、浙江省及杭州市的施工规范、规定进行施工,施工质量达到国家建设工程质量验收统一标准,达到业主的要求。5.2进度控制目标:按业主要求,确保工程在合同工期内完成。在监理过程中,我们将紧紧抓住目标不放,认真研究承建商提供的工程总进度计划和分解的周进度计划,符合目标后审批实施,并在各个阶段特别是对施工阶段各个工序的进度跟踪管理、要求承建商统筹安排施工劳动力、施工机械、周转材料,合理调整各项工序的衔接时间,督促进度计划的落实。经常对进度计划实施情况进行检查、分析,一旦发现与计划有偏差,督促承建商及时采取纠偏措施,确保实际施工天数不突破业主要求的合同工期。5.3投资控制目标:工程造价不突破投资计划在确保工程质量和进度的前提下,少花钱、办好事,认真审核工程预算。对工程进度款和设计变更严格按合同审查,确保各阶段投资实际值不突破计划目标值,控制工程决算值不突破投资计划。5.4安全生产、文明施工目标按照有关文件要求,争取创省标化工地。从施工临时设施搭设开始,我们将严格按照国家及本省市关于安全生产、文明施工、标化样板工程的各项标准要求施工单位。主要从抓现场管理入手,由总监负责,审查专项方案,结合定期检查和现场巡查,限期整改等手段,“三杜绝一确保”:杜绝工程特别重大、大事故、险性事故;杜绝责任职工死亡事故;杜绝重大火灾、爆炸事故;确保施工安全,确保达到省标化工地。5.5工程环境保护目标确保工程达到当地环境和文明施工的要求。6、监理机构的组织形式、人员配备6.1总监理工程师:于远东6.2现场监理工程师:谢斌6.3专职安全监理工程师:谢斌6.4现场监理员:陈起帆(见证取样)6.5现场监理人员可能会因各分阶段施工内容不同有适当调整,以书面通知为准。7、项目监理机构的人员岗位职责7.1.总监理工程师ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划7.1.1确定工程项目监理机构人员的分工和岗位职责;7.1.2主持编写项目监理规划,审批项目监理实施细则,并负责管理项目监理机构的日常工作;7.1.3检查和监督监理人员的工作,根据工程项目的进展情况可进行人员的调配,对不称职的人员应调换其工作;7.1.4组织并主持监理工作会议,签发项目监理机构的文件和指令;7.1.5审查承包单位提交的开工报告、施工组织设计、施工技术方案及总进度计划,提出审查意见;7.1.6审核并签署承包单位的申请、支付证书和竣工结算;7.1.7审查和处理工程变更;7.1.8主持或参与工程质量事故的调查;7.1.9调解业主和承包单位之间的合同争议和纠纷组织、处理索赔,审批工程延期;7.1.10组织编写并签署监理月报,监理工作阶段报告、专题报告和项目监理机构工作总结;7.1.11主持整理工程项目的监理资料;7.1.12审核签认分部工程和单位工程的质量检验评定资料,审查承包单位的竣工申请,组织监理人员对待验收的工程项目进行质量检查,参与工程项目的竣工验收并签署竣工资料。7.2、总监理工程师代表岗位职责7.2.1总监理工程师代表协助总监理工程师工作;7.2.2负责总监理工程师指定或交办的工作;7.2.3按总监理工程师的授权,行使总监理工程师的部分职责和权利;7.3专业监理工程师职责7.3.1负责编写本专业的监理实施细则;7.3.2负责本专业监理工作的具体实施细则;7.3.3ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划组织、指导、检查和监督本专业监理员的工作,当人员需要调整时,向总监理工程师提出建议;7.3.4审查承包单位提交的涉及本专业的计划、方案、申请、变更,并向总监理工程师提出报告;7.3.5负责本专业分项工程验收及隐蔽工程验收;7.3.6定期向总监理工程师提交本专业监理工作实施报告,对重大问题及时向总监理工程师汇报和请示;7.3.7根据本专业监理工作实际情况做好监理日记;7.3.8负责本专业监理资料的收集、汇总及整理,参与编写监理月报;7.3.9核查进场材料质量证明文件及质量情况,根据实际情况对合格进场材料,予以签认;7.3.10负责本专业的工程计量工作,审核工程量的数据和原始凭证。7.4、安全监理工程师职责7.4.1协助建设单位开展工程招标、协助建设单位与承包单位签订安全生产协议书和安全抵押金合同、监督安全生产协议书的实施。7.4.2审查承包单位提出的安全技术措施并督促实施。7.4.3监督承包单位按规定搭设安全设施、检查分部分项工程安全状况和签署安全评价意见。7.4.4参与工程事故分析。7.4.5处理并督促安全技术防范措施实施和验收。7.4.6督促承包单位及时整理现场安全管理文书资料。7.4.7协助建设单位参加竣工验收。7.4.8参与工程结算和其他与安全有关事项。7.5、监理员岗位职责7.5.1在专业监理工程师指导下开展现场监理工作;7.5.2检查承包单位投入工程项目的人力、材料、主要设备及其使用运5状况,并做好纪录;7.5.3复核或从施工现场直接获取工程计量的有关数据并签署原始凭证;ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划7.5.4按设计图纸及有关标准,对承包单位的工艺过程或施工工序进行检查和纪录,对工序的质量检查结果进行纪录;7.5.5担任旁站工作,发现问题及时指出并向专业监理工程师报告;7.5.6做好监理日记和有关的监理纪录7.6、安全监理员岗位职责7.6.1督促施工单位落实、完善安全生产保证体系,建立健全安全生产责任制。使施工现场的安全管理规范化、科学化、标准化,创建一个文明施工安全标准化工地。7.6.2审查施工方案及安全技术措施并督促其实施。7.6.3督促施工单位严格按照强制性标准的规定组织施工。7.6.4定期组织施工现场安全生产专项检查,每月向施工受监安监站报告工地安全生产情况。7.6.5对容易引发重大安全事故的工序和部位进行旁站监理。8、监理设施一、现场主要办公、检测设备序号设备名称型号数量备注1全站仪ZC11台2经纬仪J21台3水准仪DSZ1.5mm1台4砼坍落度筒15cm2只5光电测距仪DM504型1台6自动安平水平仪NA2型1台7自动击实仪DAA-102型1台8温度计1只9钢尺50m1把ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划10数码照相机1架11电脑MSI1台12打印机1台13钢卷尺3M、15M9把14游标卡尺ZL0-1501把15绝缘电阻测试仪ZC25B-21台9、工程质量控制根据本工程存在的特点和难点,对于质量控制,我们采取以主动控制,事前控制为主,牢牢把握事中控制,规范项目部的工作,确保工程质量目标的实现。9.1工程质量控制的内容9.1.1、确定本工程项目的质量要求和标准(包括施工、材料及设备等方面);9.1.2、审查承包商的资格和质量保证条件,优选承包商,确认分包者;9.1.3、审查承包单位施工管理人员的岗位证书和特种作业人员的上岗证书;9.1.4、审核原材料、构配件及设备的质量;9.1.5、检查施工质量,特别是重要工序及隐蔽工程的质量验收,核查分项分部工程质量,进行单位工程验收和项目竣工验收;9.1.6、审核施工组织设计;9.1.7、处理质量事故和安全事故;9.1.8、督促承包商建立与完善质量保证体系;9.1.9、组织与建立本项目的质量监理控制体系;9.1.10、项目实施过程中实行质量跟踪、监督、检查、控制;9.1.11、施工场地的质检验收;9.1.12、施工机械的质量控制;9.1.13、设计变更的审核;9.1.14、行使质量监督权,下达停工令;ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划9.1.15、审批开工和复工报告;9.1.16、工程进度款的支付签署和质量认证;9.1.17、定期向业主报告工程质量、进度、投资的动态报告;9.1.18、审核竣工图、竣工结算和技术文件资料;9.1.19、工程保修期的监理服务。9.2.工程质量控制工作原则9.2.1、以施工及验收规范、工程质量验评标准等为依据,督促承包单位全面实现工程项目合同约定的质量目标。9.2.2、工程项目施工全过程实施质量控制,以质量“预控”为重点。9.2.3、对工程项目的人、机、料、法、环境等因素进行全面的质量控制,监督承包单位的质量保证体系落实到位。9.2.4、严格要求承包单位执行有关材料试验和设备检验制度,坚持不合格的建筑材料、构配件和设备不准用于工程上。9.2.5、坚持本工序质量不合格或未进行验收不予签认,下道工序不得施工。9.2.6、按监理规划的要求对施工过程进行检查,及时纠正违规操作,消除质量隐患,跟踪质量问题,验证纠正结果。9.2.7、严格按照监理旁站方安案对工程的关键工序和重点部位施工过程进行旁站监理。9.3.工程质量控制的基本程序9.3.1分包单位资格审查基本程序:承包单填写《分包单位资格报审表》选择分包单位总监理工程师审查、协调签认审查意见总承包单位与分包单位签订分包合同分包单位进场施工同意不同意ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划9.3.2工程材料、构配件和设备质量控制程序材料进场重新购置材料退场损失由供货商自负材料验收、核查出厂合格证(监理公司、承建商)进行标识不合格ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划合格签署材料验收记录(监理工程师)用于工程中9.3.3施工过程质量控制的基本程序开工准备承包商提交《开工申请单》监理工程师审查开工申请批准?施工否是工序完工承包商自检监理人员检查质量质量合格?监理工程师签署《质量验收单》单项工程或分部、分项工程完成承包商提交《中间交工证书》监理工程师检查合格?验收、确认、签署《中间交工证书》否是是否处理进行下道工序ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划9.3.4 分项、分部工程签认基本程序承包单位达到分项工程报验条件进行自检承包单位填写《分项、分部工程质量报验认可表》监理工程师审核监理工程师签认分项工程承包单位继续施工达到分部工程验收条件进行自检承包单位填写《分项、分部工程质量报验认可表》附:《分项、分部工程质量评定表》监理工程师审核总监理工程师签认分部工程纠正不合格合格纠正不合格合格ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划9.3.5 单位工程验收基本程序承包单位自检合格填报《单位工程验收记录》监理工程师核查质量保证资料项目监理部进行竣工初验收建设单位组织设计、监理、承包单位验收项目总监理工程师签发《竣工移交证书》合格承包单位进行整改项目监理部签发《监理通知单》有缺陷 9.4、工程各阶段的质量控制措施根据工程项目质量形成的时间阶段,施工阶段的质量控制,分为事前控制、事中控制和事后控制。在本工程的工程建设质量控制中,监理机构将以事前控制为主。在各阶段质量控制中,监理人员将从以下各方面着手:9.4.1质量事前控制措施严格执行质量控制的技术依据:(1)熟悉设计图纸及说明书,熟悉本工程及周围环境;(2)收集施工验收规范、相关标准图集及质量评定标准;ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划(3)参加施工图纸会审及设计技术交底。同时提出监理的阅图建议和意见,从而弥补施工单位阅图时的疏忽或不足;(4)熟悉殊工程施工验收规范及质量标准;2.编制好监理工作规划。主要包括:(1)拟定监理工作流程;(2)完善组织体系、组织机构。明确岗位责任。(3)准备监理设备及监理图表。3.施工场地的检查验收(1)现场障碍物的拆迁及清除后的验收;(2)现场定位轴线、高程桩的测设、验收;4.审查施工单位的资质(1)审查施工单位的质量保证体系及主要技术负责人是否到位;(2)审查分包单位资质;5.工程材料、构配件和设备的质量控制(1)审查工程材料、构配件和设备的出厂证明,技术合格证或质保书;(2)某些工程材料、制品还需审查样品后始得订货;(3)工程材料、制品在使用前需进行抽检或试验;(4)对新材料、新型制品,应检查其技术鉴定文件;(5)对重要材料、制品、设备的生产工艺、质量控制检测手段实地考察,重要设备必须在制造厂进行质量验收。针对本工程,我们将对工程中使用的主要原材料、成品、半成品的生产厂家进行严格考察,确保工程质量;(6)检查生产厂家的生产许可证,并考察生产工艺及质保体系;6.施工机械的质量控制(1)凡直接涉及工程质量的施工机械,按技术说明书查验其相应的技术性能,不符合要求的,不得在工程中使用;(2)施工中使用的衡器、量具、计量装置应有相应的技术合格证,使用时应进行校验或校正;7.审查施工单位提交的施工组织设计或施工方案ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划(1)首先是总体的施工组织设计或施工方案,对保证质量应有可靠的技术和组织措施,并且要有明确的目标设计;我们将从这几方面来审查该方案:技术的可行性、材料设备有保证、费用不会超出预算、进度上有保证。(2)结合本工程各项目的具体情况。我们将要求施工单位编制各专项施工方案。对编制好的施工方案,我们将组织技术力量进行审核,提出书面审查意见,以期用最经济实用的措施,取得最好的效果;(3)要求施工单位提交针对当前工程质量通病制定的技术措施;(4)针对工程项目具体情况,要求施工单位提交为保证工程质量而制定的质量控制措施;(5)要求总包单位提交标准施工工艺流程图。8.生产环境、管理环境改善的措施(1)协助施工单位完善质量的措施;(2)主动向当地质监站联系,汇报在本项目开展质监的具体方法,争取当地质监站的支持和帮助;(3)审核施工单位关于材料、制品度样及试验的方法或方案;(4)审核施工单位制定的成品保护措施;(5)施工单位试验人员的资质考察;(6)完善质量报表、质量事故的报告制度等。9.4.2质量的事中控制措施1.施工工艺过程质量控制以工序质量控制为核心,设质量预控点,严格质量检查,检查每道工序投入的人、材料、机械、方法、环境是否符合要求,对工序质量控制手段如下:观察——以“目视”、“目测”进行检查监督;现场检查、旁站——现场巡视、观察及量测等到方式进行检查监督;量测——有用简单和手持式量尺、量具、量器(表)进行检查监督;测量——用测量仪器、设备进行检查;试验——通过试样、取样进行试验检查;2.工序交接检查ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划上道工序完成后,先由施工单位自检、专职检,认为合格后通知现场监理工程师或其代表到现场会同检验,检验合格后签署认可才能进下道工序。(1)施工单位初验后向现场检查员报告请予检验,主要工序检验应报告现场监理工程师;(2)工序检验一般由监理方会同施工方进行,必要时可约请业主、设计单位、市质监站派员参加;(3)工序检验意见由监理方参加人员签署;3.隐蔽工程检查验收隐蔽工程完成后,先由施工单位自检、专职检,初检合格后填报隐蔽工程质量验收通知单,报告现场监理工程师检查验收;4.工程变更的处理。5.设计变更及技术核定的处理。6.工程质量事故处理。(1)调查研究,对质量事故原因、责任进行分析;(2)质量事故处理措施的商定;(3)批准处理工程质量事故的技术措施或方案;(4)处理措施效果的检查。7.行使质量监督权,下达停工指令。为了保证工程质量,出现下述情况之一者,监理工程师发布停工令:(1)未经检验即进行下一道工序作业者;(2)工程质量下降经指出后未采取有效改正措施,或采取了一定措施而效果不好,继续作业者;(3)擅自采用未经认可或批准的材料;(4)擅自变更设计图纸的要求;(5)擅自将工程转包;(6)擅自让未经同意的分包单位进场作业者;(7)没有可靠的质保措施贸然施工,已出现质量下降征兆者。8.严格执行工程开工报告和停工后的复工报告审批制度。9.质量、技术签证。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划凡质量、技术问题方面有法律效力的最后签证,只能由项目总监理工程师一人签署,专业监理工程师,现场质检员可在有关质量、技术方面原始凭证上签署,最后由项目总监理工程师核定后才有效。10.正确行使质量否决权,为工程进度款的支付签署质量认证意见。11.建立质量监理日志。12.组织现场质量协调会。现场质量协调会一般由现场监理工程师或总监主持,协调会后应印发会议纪要。13.定期向质监、建设单位报告有关工程质量动态。现场监理部每月向质监及建设单位书面报告质量方面的动态,重大质量事故及其他方面的重大事宜不定期地及时提出报告。9.4.3质量的事后控制(1)按相应的质量标准和办法对工程进行检查和验收。(2)审核承建商提交的有关工程质量的检查、评定报告及其它技术资料。(3)审核承建商提交的竣工图。(4)整理有关工程质量的资料文件,并编目、建档。9.5.见证取样监理控制措施本项目工程量大,施工技术要求高,对使用的原材料必须符合设计及规范的要求,除了选择好的生产厂家外,对材料的检测验收显得更为重要,以保证工程质量。取样必须按照有关技术标准、规范并执行建设部(关于房屋建筑工程实行见证取样和送检的规定)的通知。在施工单位自觉遵守及监理人员的现场见证取样下保证试件代表母体的质量状况和取样的真实性,保证建设工程质量检测工作的科学性、公正性和准确性。9.5.1见证取样送样的程序(1)由我监理方向工程检测单位递交“见证单位和见证人员授权书”。写明本工程现场委托的见证单位和见证人员姓名以便检察核对。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划(2)施工单位取样人员在现场进行原材料取样和试块制作时,见证人员必须在现场见证。(3)见证人员必须对试样进行监护,并和施工单位人员一起将试样送至检测单位或采取有效的对封样措施送样。(4)由送检单位填写见证取样送检单,见证人员签名,送至检测单位,检测单位应在送检单上签名,我方将此资料归档。取样送样前必须具备质保资料齐全及经监理工程师验收。9.5.2见证人员的职责(1)取样时,见证人员必须在现场见证,随机抽样。(2)见证人员对试样进行监护。(3)见证人员必须和施工人员一起将试样送至检测单位。(4)见证人员要保证试样具有代表性和真实性。9.6旁站监理控制措施根据本工程特点对关键部位、关键工序的施工质量实施全过程现场跟班的监督活动,确定本工程旁站监理旁站监理的部位9.6.1工作内容本工程的旁站监理工作在总监理工程师的指导下,由现场监理人员负责具体实施。旁站监理人员的主要职责如下:1、检查承包单位现场质检人员到岗、特殊工种人员持证上岗及施工机械、建筑材料准备情况;2、在现场跟班监督关键部位、关键工序的施工执行施工方案以及工程建设强制性标准情况;3、核查进场材料、建筑构配件、设备和商品混凝土的质量检验报告等,并可在现场监督承包单位进行检验或者委托具有资格的第三方进行复验;4、做好旁站监理记录和监理日记,保存旁站监理原始资料。9.6.2、工作流程:ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划结合本工程的实际情况及依据相关旁站监理的规定,本工程按如下程序进行旁站监理的实施:1、承包单位根据项目监理机构编制的旁站监理方案,在需实施旁站监理的关键部位、关键工序进行施工前24小时,书面通知项目监理机构;项目监理机构由总监理工程师安排旁站监理人员按照旁站监理方案中的内容实施旁站监理;2、旁站监理在总监理工程师的指导下,由现场监理人员负责具体实施;旁站监理人员应当认真履行职责,对需要旁站的关键部位、关键工序在施工现场跟班监督,及时发现和处理旁站监理过程中出现的质量问题,如实准确地做好旁站监理记录,凡旁站监理人员和施工企业现场质检人员未在旁站监理记录上签字的,不得进行下一道工序施工;3、旁站监理人员在实施旁站监理时,发现施工企业有违反工程建设强制性标准行为的,有权责令施工企业立即整改;发现其施工活动已经或者可能危及工程质量的,应当及时向监理工程师或者总监理工程师报告,由总监理工程师下达局部暂停施工指令或者采取其他应急措施。旁站工作流程监理员、承包商签署旁站记录监理员、承包商现场整改承包商现场监理监理员制定旁站内容监理工程师、监理员监理交底,明确旁站部位监理、承包商发现问题通知整改ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划符合9.6.3、方法及措施:A、旁站监理方法施工方应根据项目监理部制定的旁站监理方案,在需要实施旁站监理的关键部位、关键工序进行施工前24小时,书面通知项目监理部。项目监理部安排旁站监理人员按照旁站监理方案实施旁站监理。旁站监理在总监理工程师的指导下,由现场监理人员担任。由专业监理工程师在重要的工程部位和隐蔽工程施工前对监理员实施技术交底,明确各项重要工作控制点。对需要实施旁站监理的关键部位、关键工序在施工现场跟班监督,运用目测法、量测法及试验法等手段进行检查,及时发现和处理旁站监理过程中出现的质量问题,向监理工程师反映并处理,并如实准确地做好旁站监理记录。9.6.4、旁站监理人员的主要职责:1)检查施工方现场质检人员到岗、特殊工种人员持证上岗以及施工机械、建筑材料准备情况;2)在现场跟班监督关键部位、关键工序的施工执行施工方案以及工程建设强制性标准情况;3)核查进场建设材料、建筑构配件、设备和商品混凝土的质量检验报告等,并可在现场监督施工方进行检验或者委托具有资格的第三方进行复验;4)做好旁站监理记录和监理日记,保存旁站监理原始资料。B、旁站监理措施:ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划旁站监理人员实施旁站监理时,发现施工企业有违反工程建设强制性标准行为的,有权责令施工企业立即整改;发现其施工活动已经或者可能危及工程质量的,应当及时向监理工程师或者总监理工程师报告,由总监理工程师下达局部暂停施工指令或者采取提他应急措施。对于需要旁站监理的关键部位、关键工序施工,凡没有实施旁站监理或者没有旁站旁站监理记录的,监理工程师或者总监理工程师不得在相应文件上签字。凡旁站监理人员和施工企业现场质检人员未在旁站监理记录(见附件)上签字的,不得进行下一道工序施工。旁站监理记录是监理工程师或者总监理工程师依法行使有关签字权的重要依据。工程竣工验收后,旁站监理记录将存档备查。9.7供水管道工程监理质量控制9.7.1、组织监理部人员熟悉设计图纸,找出关键控制点,制定相应的控制措施,编制监理细则。9.7.2、组织对施工单位技术、质检、试验和操作班组长的监理交底,向业主和施工单位提供监理细则,把监理对本工序的控制点和质量要求对施工单位交底,做到参与施工、监理的人员都对质量要求心中有底,按程序进行施工和检验。9.7.3、测量放样监理控制措施1、监理人员在熟悉设计文件和图纸的基础上,会同承包人或勘测部门在现场交接中线控制桩和水准点,并指示和检查承包人对所有测量控制桩和水准点,进行有效的保护,直到工程竣工验收结束。2、监理工程师应审核和检查承包人提交的施工放样报验及测量资料。对进行检查验收合格的,及时给予书面认可;发现有差错,应及时通知承包人重测,合格后再予以书面认可。3、监理工程师应对承包人以加密控制点、辅助基线、临时水准点和施工放样为目的的测量工作,进行现场监督、检查、复核并认可。4、根据本工程输送管道施工开挖面积大,线路长,所经过的管道路线牵连到各农田,鱼塘等农户的个人利益的特点,对以加密控制点、辅助基线、临时水准点和施工放样基线,积极做好配合与村委农户的协调工作。5、管道的运输、安装严格的按有关条文要求执行。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划9.7.4、基沟开挖、回填的监理控制1、审核施工单位有关基沟开挖的施工技术方案,经论证后签认审核结论。2、检查施工单位施工机械设备人员是否满足施工需要。3、基沟开挖后必须用经纬仪精确放样监理人员跟踪检查.在监理工程师确认基坑平整无积水,各部尺寸及标高符合设计要求,签字认可后承包商方可进行下道工序。4、基坑开挖检查项目及允许偏差。序号项目允许偏差(MM)检验频率检验方法检验程序监理检验认可程序1沟底高程±305用水准仪测量自检跟踪检查2轴线位移502用经纬仪测量自检跟踪检查3基沟尺寸不小于规定4用尺量每边1点自检平行检查5、严格控制基沟开挖与附近电线杆的距离。6、根据设计要求回填土,用于管顶以上500MM范围内的回填土,不得含有机物及粒径大于50MM的砖、石块硬块,严禁不合格土方用于工程上。7、当沟槽处于耕地或农田时,控制管道顶面以上500MM范围应采用可耕植土料松填整平,并控制预留一定的沉降量。8、回填前对施工机械、场地道路等情况进行检查,未经特殊处理,大型机械来得在未按路基要求进行填土处理、以及达不到相应路基荷载要求的管道顶部行驶,以防管道压坏。9、当管道穿越暗河、暗塘,其基底为淤泥层时,根据持力层土层情况采用换土垫层或其它地基处理方法。当厚度不大于1.0米时可采用粗砂回填,如淤泥厚度宽度大于1000,或在施工时因基坑失稳使基槽地步产生过大的涌土、回填等不良施工情况,应及时通知设计方,商定处理方案。9.7.5、钢管施工的质量监理控制1、严格控制进场的钢管标准,是否符合设计规定的管节材料、规格、压力等级、加工质量等要求。2、管节表面是否有斑痕、裂纹、严重锈蚀等缺陷。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划3、进场的钢管焊缝外观应符合规范要求,焊接:焊接表面不得有裂缝、烧穿、结瘤和较严重的夹渣、气孔等缺陷;钢板卷管或螺旋钢管对接,纵焊缝应相互错开100mm以上,直线管段相邻两环形焊缝之间距离不应小于200mm;对口间隙尺寸,壁厚5—9mm者不大于2mm,壁厚大于9mm者不大于3mm。4、法兰连接:法兰盘对接应平行、紧密、垫片不应使用双层,与管道中心线应垂直。螺帽应在同一面,螺栓露出螺帽的长度应大雨螺栓直径的1/2。5、铁锈、污垢应清除干净,油漆颜色和光泽应均匀,附着良好,不得有遗漏、脱皮、起折、起泡等现象。6、现场钢管焊接的控制;焊条的选择与保管,必须符合管节焊接规定条件,焊条应干燥,焊缝修口与清根管端端面的坡口角度、钝边、间隙必须符合规范。7、控制对焊管接口纵向焊缝应错开布置,相邻纵向焊缝应错开距离不小于300,环向焊缝应避免设在支承处及跨中。8、管道安装前,严格控制逐根测量、编号、宜选用管径相差最小的管节组对接。管节下沟前应先检查管节的内外防腐层,检查合格后方可下管。9、管节组成管段下管时,管段的长度、吊距,应根据管径、壁厚、外防腐材料的种类及下管方法确定。在吊装时应合理地确定吊距,以使管节的纵向弯曲变形最小,避免将管材的内外防腐层损伤。对存在问题的提出更改或禁止下管。9.7.6、钢管的防腐质量监理控制1、本工程钢管的防腐处理非常重要,防腐处理时,内外壁应进行喷砂处理,必须达到GB8+23-88中的SA2.5级标准,对于需进行现场防腐处理的管配件及对焊缝处,应人工除锈,彻底清除表面浮锈,污杂物,焊渣等时方可防腐施工。2、防腐施工进应保持表面干燥、无水迹,涂料之间的涂料间隔要求表面干燥。3、内防腐;用于内防腐的涂料必须具有卫生部颂发的卫生许可证,根据设计可采用IPN8710-2B饮水容器涂料,施工方法:二底二面,厚度控制为200微米。4、外防腐;ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划埋地钢管外壁防腐,采用IPN8710-3厚浆型涂料,施工方法:二底三面工艺,厚度应不小于300微米。施工时要求包紧、不翘、不皱、不漏色,涂料不流淌。管桥外壁防腐,采用IPN8710-2C耐候保色涂料,施工方法:二底二面工艺,厚度应为200微米。5、严格控制钢管安装前应完成每个管段的施工及检验,凡未通过验收的,均不可进入钢管安装。9.7.7、钢管的水压试验按《给水排水管道管道工程施工及验收规范》进行试压,并做好各项记录。9.7.8、管桥施工的质量监理控制一、管桥工程开工之前监理控制应要求承包人按设计的要求,准确定出桥位(纵、横轴线)以及各墩、台的位置以及各部位的高程,然后监理人员进行检查复测。在施工过程中,还需要对每个分项、部位的位置及高程进行定位和检查。(监理工作的主要任务十对承包人所设置的桥位纵横轴线的控制点,从当地水准网的水准点引来作为控制全桥高程的现场水准点,以及各主体部位(如墩、台)的位置控制点进行检验(检验的内容有高程测量,桥位测定及测距三项)。根据本工程的特点,对桥梁工程中以下内容实行重点预控。二、施工准备阶段的控制1)审核承包单位项目经理部提交的钻孔灌注桩施工技术方案,包括钻孔、清孔、水下砼灌注等主要施工工序流程,生产组织安排等,签认审核结论。2)审核承包单位项目经理部所编制的灌注桩施工进度计划。3)查验施工测量放线成果,复核水准点和桩位定位轴线,桩号应进行反复校核。4)对进场设备机具的规格型号,性能及完好率进行查验,要求施工单位填写进场设备报验认可单。5)对原材料进行检验,包括钢筋、焊条、水泥、石子、砂等,要求填写材料/构配件/设备报验单。6)施工单位必须配备现场试验检测仪器,并保证能够对工序及时快速进行验证。如泥浆比重计,砂率测定仪、粘度计、测绳、50m长钢尺等。7)审查砼配合比报告单。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划8)检查记录各钻机的钻头长度、直径,钻杆长度、编号等。9)审核分包合同单位资质及其有关资料。10)监理参加施工单位的技术交底和安全交底会,审查安检准备工作情况。11)检查各类专业人员的合格证或上岗证,包括质检、试验、电焊、机驾等人员。12、探明桩位处是否有管线穿过,注意邻近管线的保护措施及老桥和相邻建筑物的保护措施。三、现场质量控制要点1、护筒埋设1)检查护筒中心位置,在护筒顶拉十字线定出桩位中心,允许偏差≤5cm。护筒内经必须大于设计桩径10~20cm。2)检查护筒垂直度,允许偏差≤1%,护筒外形要圆直。3)护筒顶标高及护筒埋深满足施工需要,但不得低于规范要求值,护筒埋设应牢固,不漏水。2、泥浆系统1)砌筑的泥浆池和沉淀池容积满足钻孔桩循环使用,且保证各池的功能正常。2)钻孔泥浆指标满足规范要求。进入基岩后应严格控制泥浆含率,必要时制备优质泥浆换浆。3)清孔后泥浆指标应能满足规范要求,最大不超过10%。4)废浆清运要注意对环境的保护,做到文明施工。3、钻孔、清孔向施工单位特别提示每根钻孔灌注桩开孔前,必须得到监理工程师的签认方能开孔。1)钻机就位后,复核钻杆位置,钻杆要求垂直,允许偏差<0.5%,中心偏位允许偏差≤5cm。现场应用水平尺检查转盘水平度,底盘应稳固。施工过程中,监理人员随时抽查运行钻机的水平与垂直情况。2)钻孔过程中应注意地层变化,要求按不同地层情况,严格控制钻孔进尺速度,及时调制泥浆比重,如实填写钻孔原始记录,且不得涂改。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划3)钻孔桩施工时,如发现地质情况与地质勘察报告不符,应及时通知监理工程师,并写出书面材料由建设、设计单位参加研究。钻孔桩严禁放在断层上及斜坡较大的强风化岩层上。4)孔深进入持力层,深度符合设计要求。4、钢筋笼的制作安装1)终孔验收钻孔至设计标高施工单位自检确认后报监理工程师审核,而后进行清孔。监理工程师对终孔进行检查验收,复核测绳长度与钻杆长度,测孔深推算桩长,桩长不应小于设计要求。用探孔器检查孔径。探孔器为一钢筋制作的圆柱体,长度为孔径的4~6倍,探孔器直径同钻头直径相同,探孔器应能顺利下放到孔底,方可认为该孔径合格。孔径的准确位置应标在护筒周边上,并用十字线的交点显示孔的中心位置,由探孔器的中心线与十字线的偏差测算孔径偏差。成孔检查合格,监理工程师签字认可;否则应采取措施以满足设计和规范要求。按常规检查钢筋笼的规格(包括各筋规格、间距、长度、直径等)、焊接情况,保护层垫块等,监理人员的检查一般应在施工单位专职质检员自检合格后进行。2)钢筋笼下放,两节钢筋笼焊接后,现场监理员应对焊接长度,焊缝质量,接头位置进行检查,单面焊缝长度≥10d,(d为钢筋直径)垂直度偏差1%,接头位置错开35d以上。3)钢筋笼下放遇阻难以下落时,不得强行下放钢筋笼,避免造成钢筋笼扭曲变形。要注意判断是否已发生缩孔或斜孔现象,如缩孔必须提起钢筋笼进行扫孔,斜孔严重必须回填重钻。4)钢筋笼焊接、下沉应尽快完毕,并要检查钢筋笼的顶面高程和中心位置,位置调整正确后应固定好,现场监理人员签认隐检记录。5、导管下放:1)导管长度应能满足水下砼的灌注,底管长度≥4m,导管接头不能漏水,导管下放后,下口距孔底悬高30~50cm为宜。导管直径宜20~25cm。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划2)导管下放应抓紧进行,尽量缩短提钻至灌注砼之间的时间,严防坍孔缩孔。3)检测孔底沉渣厚度,建议采用测针测饼法检测。孔中不同位置泥浆的平均相对密度,检测指标值不能满足设计要求时须进行第二次清孔,待重新检查后满足要求,方可进行下道工序施工。6、水下砼灌注全过程旁站1)提前检测初灌砼储料斗容量,保证首批砼数量能埋管不少于1.0m高度。2)在灌注过程中要记录灌注混凝土的数量和混凝土顶面标高,导管埋深保证2~6m,每次拆导管前必须测算出导管埋深,严防导管埋深少于2m,产生夹层。检查钢筋笼是否上浮,采取措施防止继续上浮。3)商品砼每车检查砼坍落度一次,砼坍落度宜为18~22cm。4)灌注砼末期,保证漏斗底口高出水面4~6m。砼灌注应按设计要求,桩顶超灌1D。(D为桩径)。5)见证试块取样制作过程并进行标识。四、承台、盖梁施工阶段的监理:1、垫层在浇筑砼前监理人员复核其尺寸和侧模标高,符合要求后方可按照已调整的砼施工配合比进行拌合浇筑,砂、碎石材料每拌过磅称量。监理人员旁站砼拌制、浇筑过程,做好施工监理记录,并见证砼制件取样。当不采用垫层时,应保持基底原状土不受扰动、浸泡。2、垫层砼完成后,必须在垫层上重新放样,监理工程师检查复核,承台轴线及长宽尺寸满足设计要求后,承包人可进行下道工序施工。3、承包人在垫层验收后,可以安装承台钢筋和模板。对钢筋、模板自检符合设计及规范要求的,将自检资料提交给监理工程师,待监理工程师检查复核并确认钢筋,模板满足要求,各部尺寸和标高符合设计要求后,签认同意进行下道工序施工。4、承台商品砼每车放入模板内之前,必须经试验合格并得到监理人员的同意。砼浇筑必须按施工规范要求分层浇筑,砼分层厚度控制在30cm内,相邻两层砼浇筑时间间隔不超过1小时。砼入模须从四周放入(倒入),严禁用振动棒输送砼,砼振捣至无沉陷,无气泡冒出,且无漏振,监理人员旁站砼浇捣全过程。见证砼试件取样。商品砼每车检测坍落度,其控制值为6-10cm。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划5、承台与台身接触面应拉毛,并有部分石笋,无松散砼。预埋筋外露部分应清洁无砼残渍。台身柱模板位置四边水平高差要一致,相差不超过3毫米,以保证台身模板符合规范要求。6、承台模板需待砼达到2.5Mpa后方可拆除,模板拆除时要认真细致,不可野蛮施工,造成砼缺角少边。7、承台收浆初凝后,即用湿麻袋覆盖养生;24小时后,洒水养生不少于14天,每天保持砼面湿润。8、待模板拆除后,承包人对承台进行质量检验评定,自检评定资料经监理工程师检查复核。当承台质量评定为合格且监理工程师签字认可后,方可进行下道工序施工。9、基础部位完工后,及时进行该部位的检验评定,监理工程师复核并签认。五、监理检查项目方法及允许偏差:1、承台、盖梁:序号项目允许偏差(mm)检验频率检验方法检验程序监理检验认可程序总数1受力钢筋成型长度+5~-1010%且不小于5件每件1点用钢尺量自检平行检查2弯起钢筋弯起点位置±2010%且不小于5件每件1点用钢尺量自检平行检查弯起高程0,-1010%且不小于5件每件1点用钢尺量自检平行检查3箍筋尺寸0、-52用钢尺宽高各1点自检平行检查4受力钢筋间距±204在任意一个断面连续量取钢筋间距,取其平均值计1点自检平行检查5箍筋及构造筋间距±205连续量取5档,取平均值计1点自检平行检查6保护层厚度±106用钢尺量自检平行检查7同一截面内受拉钢筋接头截面积占钢筋总载面积焊接:不大于50%受拉钢筋全截面上接头观察自检平行检查绑扎:不大于25%8相邻两板平面高低差24用尺量自检平行检查9表面平整度34用2M直尺检验自检平行检查ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划10垂直度0.2%H且不大于202用垂线或经纬仪检查自检平行检查11模内尺寸+10、-203用钢尺量长、宽、高各1点自检平行检查12轴线位移152用经纬仪测量,纵、横各1点自检平行检查13支承面高程+2、-51用水准仪测量自检平行检查14搞压强度不小于设计要求≥1组试件试压自检抽检20%15断面尺寸宽±205用钢尺量自检平行检查高4上下各1点自检平行检查长16顶面高程±104用水准义测量自检平行检查9.7.9、混凝土检查井(蝶阀井)⑴砖砌井井壁垂直,无通缝,保证灰浆每皮灌缝饱满,灰缝平整,抹面压光,无空鼓、裂缝现象;钢筋砼现浇井要对钢筋进行隐蔽检查,对模板支设进行检查,砼浇筑时作好旁站监理工作;井内流槽应平顺,踏步应安装牢固、位置准确无杂物。井壁抹灰要求分层进行,防止空鼓。⑵铸铁井盖及复合井盖须要有生产厂家出厂合格证及使用认可证书。必要时对进厂配件进行见证取样检测,以保证质量。并要求在路面施工前调整好标高。⑶井框、井盖必须符合标准要求,安装平稳、位置正确。安装时座浆,并处理好倒三角处的砼密实性。⑷与原有排水管相交部位,必须对原排水管采取临时支护措施,保证原排水管正常使用。二、混凝土分项工程监理控制要点1、原材料   ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划水泥进场时应对其品种、级别、包装或散装仓号、出厂日期等进行检查,并应对其强度、安定性及其他必要的性能指标进行复验,其质量必须符合现行国家标准《硅酸盐水泥、普通硅酸盐水泥》GB175。    当在使用中对水泥质量有怀疑或水泥出厂超过三个月(快硬硅酸盐水泥超过一个月)时,应进行复验,并按复验结果使用。     钢筋混凝土结构、预应力混凝土结构中,严禁使用含氯化物的水泥。 检查数量:按同一生产厂家、同一等级、同一品种、同一批号且连续进场的水泥,袋装不超过200t为一批,散装不超过500t为一批,每批抽样不少于一次。检验方法:检查产品合格证、出厂检验报告和进场复验报告。说明:7.2.1 水泥进场时,应根据产品合格证检查其品种、级别等,并有序存放,以免造成混料错批。强度、安定性等是水泥的重要性能指标,进场时应作复验,其质量应符合现行国家标准《硅酸盐水泥、普通硅酸盐水泥》GB175、《矿渣硅酸盐水泥、火山灰质硅酸盐水泥及粉煤灰硅酸盐水泥》GB1344、《复合硅酸盐水泥》GB12958等的要求。水泥是混凝土的重要级成成分,若其中含有氯化物,可能引起混凝土结构中钢筋的锈蚀,故应严格控制。本条为强制性条文,应严格执行。此同时混凝土中掺用外加剂的质量及应用技术应符合现行国家标准《混凝土外加剂》GB8076、《混凝土外加剂应用技术规范》GB50119等和有关环境保护的规定。  预应力混凝土结构中,严禁使用含氯化物的外加剂。钢筋混凝土结构中,当使用含氯化物的外加剂时,混凝土中氯化物的总含量应符合现行国家标准《混凝土质量控制标准》GB50164的规定。检查数量:按进场的批次和产品的抽样检验方案确定。检验方法:检查产品合格证、出厂检验报告和进场复验报告。说明:7.2.2 混凝土外加剂种类较多,且均有相应的质量标准,使用时其质量及应用技术应符合国家现行标准《混凝土外剂》GB8076、《混凝土外加剂应用技术规范》GBJ50199、《混凝土速凝剂》JC472、《混凝土泵送剂》JC473、《混凝土防水剂》JC474、《混凝土防冻剂》JV475、《混凝土膨胀剂》JC476ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划等的规定。外加剂的检验项目、方法和批量应符合相应标准的规定。若外加剂中含有氯化物,同样可能引起混凝土结构中钢筋的锈蚀,故应严格控制。本章中涉及原材料进场检查数量和检验方法时,除有明确规定外,都应按本规范第5.2.1条的说明理解、执行。本条为强制性条文,应严格执行。7.2.3 混凝土中氯化物和碱的总含量应符合现行国家标准《混凝土结构设计规范》GB50010和设计的要求。       检验方法:检查原材料试验报告和氯化物、碱的总含量计算书。2、配合比设计     混凝土应按国家现行标准《普通混凝土配合比设计规程》JGJ55的有关规定,根据混凝土强度等级、耐久性和工作性等要求进行配合比设计。     对有特殊要求的混凝土,其配合比设计尚应符合国家现行有关标准的专门规定。检验方法:检查配合比设计资料。 3、混凝土施工     结构混凝土的强度等级必须符合设计要求。用于检查结构构件混凝土强度的试件,应在混凝土的浇筑地点随机抽取。取样与试件留置应符合下列规定:1 每拌制100盘且不超过100m³的同配合比的混凝土,取样不得少于一次;2 每工作班拌制的同一配合比的混凝土不足100盘时,取样不得少于一次;3 当一次连续浇筑超过100m³时,同一配合比的混凝土每200m³取样不得少于一次;4 每一楼层、同一配合比的混凝土,取样不得少于一次;5 每次取样应至少留置一组标准养护试件,同条件养护试件的留置组数应根据实际需要确定。检验方法:检查施工记录及试件强度试验报告。6、对有抗渗要求的混凝土结构,其混凝土试件应在浇筑地点随机取样。同一工程、同一配合比的混凝土,取样不应少于一次,留置组数可根据实际需要确定。检验方法:检查试件抗渗试验报告。7、混凝土原材料每盘称量的偏差应符合表7.4.3的规定。表7.4.3               原材料每盘称量的允许偏差ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划     材料名称允许偏差 水泥、掺合料              ±2%  粗、细骨料              ±3%  水、外加剂              ±2%8、混凝土运输、浇筑及间歇的全部时间不应超过混凝土的初凝时间。同一施工段的混凝土应连续浇筑,并应在底层混凝土初凝之前将上一层混凝土浇筑完毕。  当底层混凝土初凝后浇筑上一层混凝土时,应按施工技术方案中对施工技术方案中施工缝的要求进行处理。检查数量:全数检查。检验方法:观察,检查施工记录。三、模板分项工程监理控制要点 1、模板安装               安装现浇结构的上层模板及其支架时,下层楼板应具有承受上层荷载的承载能力,或加设支架;上、下层支架的立柱应对准,并铺设垫板。  检查数量:全数检查。  检验方法:对照模板设计文件和施工技术方案观察。 在涂刷模板隔离剂时,不得沾污钢筋和混凝土接槎处。  检查数量:全数检查。  检验方法:观察。              预埋件和预留孔洞的允许偏差          项   目   允许偏差(mm)    预埋钢板中心线位置      3   预埋管、预留孔中心线位置      3 插筋 中心线位置      5外露长度      +10,0ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划 预埋螺栓中心线位置      2外露长度      +10,0预留洞中心线位置       10尺寸+10,0现浇结构模板安装的允许偏差及检验方法       项  目允许偏差(mm)    检验方法      轴线位置   5    钢尺检查    底模上表面标高   ±5水准仪或拉线、钢尺检查截面内部尺寸 基  础   ±10    钢尺检查柱、墙、梁 +4,-5    钢尺检查层高垂直度不大于5m    6经纬仪或吊线、钢尺检查 大于5m    8经纬仪或吊线、钢尺检查相邻两板表面高低差    2     钢尺检查 表面平整度    32m靠尺和塞尺检查2、模板拆除   底模及其支架拆除时的混凝土强度应符合设计要求;当设计无具体要求时,混凝土强度应符合表4.3.1的规定。检查数量:全数检查。检验方法:检查同条件养护试件强度试验报告。 表4.3.1   底模拆除时的混凝土强度要求构件类型构件跨度(m)达到设计的混凝土立方体抗压强度标准值的百分率(%)板≤2≥50>2,≤8≥75ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划>8≥100梁、拱、壳≤8≥75>8≥100悬臂构件-≥100说明:由于过早拆模、混凝土强度不足而造成混凝土结构构件沉降变形、缺棱掉角、开裂、甚至塌陷的情况时有发生。为保证结构的安全和作用功能,提出了拆模时混凝土强度的要求。该强度通常反映为同条件养护混凝土试件的强度。考虑到悬臂构件更容易因混凝土强度不足而引发事故,对其拆模时的混凝土强度应从严要求。4.3.2 对后张法预应力混凝土结构构件,侧模宜在预应力张拉前拆除;底模支架的拆除应按施工技术方案执行,当无具体要求时,不应在结构构件建立预应力前拆除。 检查数量:全数检查。 检验方法:观察。后浇带模板的拆除和支顶应按施工技术方案执行。 检查数量:全数检查。检验方法:观察。9.8.2基坑围护施工监理质量控制一、混凝土灌注桩监理控制要点1、施工前应对水泥、砂、石子(如现场搅拌)、钢材等原材料进行检查,对施工组织设计中制定的施工顺序、监测手段(包括仪器、方法)也应检查。2、施工中应对成孔、清查、放置钢筋笼、灌注混凝土等进行全过程检查,人工挖孔桩尚应复验孔底持力层土(岩)性。嵌岩桩必须有桩端持力层的岩性报告。3、施工结束后,应检查混凝土强度,并应做桩体质量及承载力的检验。4、混凝土灌注桩的质量检验标准应符合表5.6.4-1、表5.6.4-2的规定。混凝土灌注桩钢筋笼质量检验标准(mm)项目检查项目允许偏差或允许值检查方法主控项目主筋间距±10用钢尺量ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划   长度±10用钢尺量钢筋材质检验设计要求抽样送检箍筋间距±20用钢尺量直径±10用钢尺量混凝土灌注桩质量检验标准项目检查项目允许偏差或允许值检查方法单位数值主控项目桩位见本规范表7.1.4 基坑开挖前量护筒,开挖后量桩中心孔深mm+300只深不浅,用重锤测,或测钻杆、套管长度,嵌岩桩应确保进入设计要求的嵌岩深度桩体质量检验按基桩检测技术规范。如钻芯取样,大直径嵌岩桩应钻至桩尖下50mm按基桩检测技术规范混凝土强度设计要求试件报告或钻芯取样送检承载力按基桩检测技术规范 按基桩检测技术规范 一般项目垂直度见本规范表7.1.4测大管或钻杆,或用超声波探测,干施工时吊垂球桩径见本规范表7.1.4井径仪或超声波检测,干施工时吊垂球ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划泥浆比重(粘土或砂性土中)1.15-1.20用比重计测,清孔后在距孔底50cm处取样泥浆面标高(高于地下水位)m0.5-1.0目测沉渣厚度:端承桩摩擦桩mmmm≤50≤150用沉渣仪或重锤测量混凝土坍落度:水下灌注  干施工mmmm160-22070-100坍落度仪钢筋笼安装深度mm±100用钢尺量混凝土充盈系数>1检查每根桩的实际灌注量桩顶标高mm+30-50水准仪,需扣除桩顶浮浆层及劣质桩体二、水泥土搅桩监理控制要点1、施工前应检查水泥及外掺剂的质量、桩位、搅拌机工作性能及各种计量设备完好程度(主要是水泥浆流量计及其他计量装置)。2、施工中应检查机头提升速度、水泥浆或水泥注入量、搅拌桩的长度及标高。3、施工结束后,应检查桩体强度、桩体直径及地基承载力。4、进行强度检验时,对承重水泥土搅拌桩应取90d后的试件;对支护水泥土搅拌桩应取28d后的试件。5、水泥土搅拌桩地基质量检验标准应符合表。水泥土搅拌桩地基质量检验标准项目检查项目允许偏差或允许值检查方法单位数值主控项水泥及外掺剂质量设计要求查产品合格证书或抽样送检ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划目水泥用量参数指标查看流量计桩体强度设计要求按规定办法地基承载力设计要求按规定办法一般项目机头提升速度m/min≤0.5量机头上升距离及时间桩底标高mm+200测机头深度桩顶标高mm+100-50水准仪(最上部500mm不计入)桩位偏差mm<50用钢尺量桩径<0.04D用钢尺量,D为桩径垂直度%≤1.5经纬仪搭接mm>200用钢尺量9.8.3土方开挖工程监理控制要点1、土方开挖前应检查定位放线、排水和降低地下水位系统,合理安排土方运输车的行走路线及弃土场。2、施工过程中应检查平面位置、水平标高、边坡坡度、压实度、排水、降低地下水位系统,并随时观测周围的环境变化。3、临时性挖方的边坡值应符合表的规定。临时性挖方边坡值土的类别边坡值(高:宽)砂土(不包括细砂、粉砂)1:1.25-1:1.50一般性粘土硬1:0.75-1:1.00硬、塑1:1.00-1:1.25软1:1.50或更缓碎石类土充填坚硬、硬塑粘性土1:0.50-1:1.00充填砂地土1:1.00-1:1.50注:1设计有要求时,应符合设计标准ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划   2如采用降水或其他加固措施,可不受本表限制,但应计算复核。   3开挖深度,对软土不应超过4cm,对硬土不应超过8cm.4、土方开挖工程质量检验标准应符合表的规定。土方开挖工程质量检验标准(mm)项目检查项目允许偏差或允许值检验方法柱基基坑基槽挖方场地平整管沟地(路)面基层人工机械主控项目标高-50±30±50-50-50水准仪长度、宽度(由设计中心线向两边量)+200-50+300 -100+500 -150+100 经纬仪,用钢尺量边坡设计要求观察或用坡度尺检查一般项目表面平整度2020502020用2m靠尺和楔形塞尺检查基底土性设计要求观察或土样分析9.8.4降水与排水监理控制要点1、降水与排水是配合基坑开挖的安全措施,施工前应有降水与排水设计。当在基坑外降水时,应有降水范围的估算,对重要建筑物或公共设施在降水过程中应监测。说明:降水会影响周边环境,应有降水范围估算以估计对环境的影响,必要时需有回灌措施,尽可能减少对周边环境的影响。降水运转过程中要设水位观测井及沉降观测点,以估计降水的影响。2、对不同的土质应用不同的降水形式,表为常用的降水形式。 降水类型及适用条件适用条件降水类型 渗透系数可能降低的水位深度(m)轻型井点10-2-10-53-6ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划多级轻型井点6-12喷射井点10-3-10-68-20电渗井点<10-6宜配合其他形式降水使用深井井管≥10-5>103、降水系统施工完后,应试运转,如发现井管失效,应采取措施使其恢复正常,如无可能恢复则应报废,另行设置新的井管。4、降水系统运转过程中应随时检查观测孔中的水位。5、基坑内明排水应设置排水沟及集水井,排水沟纵坡宜控制在1‰-2‰。6、降水与排水施工的质量检验标准应符合表的规定。降水与排水施工质量检验标准检查项目允许值或允许偏差检查方法单位数值排水沟坡度‰1-2目测:坑内不积水,沟内排水畅通 井管(点)垂直度   %1插管时目测井管(点)间距(与设计相比)%≤150用钢尺量井管插入深度(与设计相比)mm≤200水准仪过滤砂砾料填灌(与计算值相比)mm≤5检查回填料用量井点真空度:轻型井点   喷射井点kPakPa>60>93真空度表真空度表ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划10、工程进度控制10.1.进度控制的内容通过编制工程总进度计划和对施工单位提供的进度计划进行审核,并在施工阶段各个工序的进度目标跟踪管理,督促施工单位统筹安排施工劳动力、施工机械、周转材料,合理衔接各项工序的开竣工时间,控制各分部的工期,确保整个工程在合同工期内完成。内容包括以下几点:(1)审批承包商报送的施工总进度计划,帮助承建商完善进度计划使之能根据主、客观因素(气候、人力、机械、资金材料、人文环境)随时调整进度计划并监督执行。:(2)总监理工程师审批承包商编制的年、季、月度施工进度计划;(3)专业监理工程师对进度计划实施情况的检查、分析,定期进行施工进度计划和实际完成值的比较,并对比较结果作出分析,当实际进度符合计划进度时,专业监理工程师应要求承包商编制下一期进度计划;当实际进度滞后于计划进度时,应书面通知承包商采取纠偏措施并实施。;(4)对施工条件、自然环境以及人文环境预先进行风险分析,及时分析判断制约施工进度的不利因素,督促承建商及时采取控制措施,化解制约因素加快施工进度,使进度计划具有应变能力。(5)应督促承建商尽量避免因待料或质量事故而引起停工和返工。(6)根据本工程施工工期和各工序的特点,提醒承建商在安排计划中要考虑雨天对施工的影响。10.2进度控制基本程序ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划10.3进度控制的措施针对本工程的特点,我公司结合多年工作的经验认为在在组织措施上做到:落实进度控制的责任,建立进度控制协调制度;在技术措施上:建立施工作业计划体系,增加同时作业的施工面,采用高效能的施工机械设备,采用施工新工艺、新技术,缩短工艺过程和工序间的技术间歇时间;在经济措施上:对由于承建商的原因延误工期者进行必要的经济处罚,对工期提前者实行奖励;在合同措施上:按合同要求及时协商有关各方的进度,以确保项目形象进度的要求。下面我们将从施工的各个阶段上着手实施:10.3.1进度的事前控制1.编制项目实施总进度计划。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划项目实施总进度计划为项目实施起控制作用的工期目标,是确定施工承包合同期条款、审核施工单位提交的施工计划、确定和审核施工进度与材料设备供应进度、资金、资源计划是否协调的依据。2.审核施工单位提交的施工进度计划。主要审核是否符合总工期控制目标的要求,审核施工进度计划与施工方案的协调性和合理性等。3.审核施工单位提交的施工方案。主要审核工期,以及是否提出了充分利用时间、空间、保证“全天候”施工的合理、可行的技术组织措施。4.审核施工单位提交的施工总平面图。主要审核施工总平面图与施工方案、施工进度计划的协调性和合理性。5.审定由建设单位供应材料、设备的采、供计划。提供项目所需的材料、设备的需用量及供应时间参数,审定有关材料、设备采供计划。6.协助建设单位按期限完成现场障碍物的拆除,及时向施工单位提供现场。7.协助建设单位按合同规定及时向施工单位提交设计图纸等设计文件。8.协助建设单位按合同规定及时向施工单位支付备料款。10.3.2进度的事中控制1.建立反映工程进度状况的监理日志。逐日如实记载每日形象部位及完成的实物工程量,同时,如实记载影响工程进度的各种因素。暴雨、大风、现场停水、现场停电等应注明起止时间。2.工程进度的检查审核施工单位每周、每月提交的工程进度报告;计划进度与实际进度的差异;形象进度、实物工程量与工程量指标完成情况的一致性。3.按合同要求,及时进行工程计量验收(需和质量验收协调进行)。4.有关进度、计量方面的签证。进度、计量方面的签证是支付工程进度款、计算索赔、延长工期的重要依据,专业监理工程师、现场监理员需在有关原始凭证上签署,由项目总监理工程师核签后生效。5.工程进度的动态管理。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划实际进度与计划进度发生差异时,应分析产生的原因,提出进度调整的措施和方案,并相应调整施工进度计划及材料设备,资金等进度计划,必要时调整工期目标。6.为工程进度的支付签署进度,计量方面认证意见。7.组织现场协调会。现场协调会一般应定期召开并印发会议纪要。协调会的主要内容是:(1)上次协调会执行结果的检查;(2)协调总承包单位不能解决的内、外关系问题;(3)总图管理上的问题;(4)现场有关重大事宜;8.定期向总监、建设单位报告有关工程进度情况。10.3.3进度的事后控制1、进行实际进度与计划进度的对比,分析发生差异的原因。2、制定保证总工期不突破的对策措施。3、制定总工期突破后的补救措施。4、调整相应的施工计划、材料设备、资金供应计划等,以新的条件组织新的协调和平衡。11、工程投资控制11.1.从施工设计图的质量以及以往工程经验,本工程将会出现很多工程联系单,费用难免会有所增加,我们将采取如下措施:1、场后立即对现场高程进行测量。2、及时与业主联系,提出合理化建议,控制好费用的增加情况。3、设立路基沉降观测点,加强对路基沉降的观测,对高程测量数据进行收集管理,为工程完工后提供准确数据。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划4、对设计变更用台帐登记,并把工程量的增减情况及费用情况告知业主,及时掌握工程费用的总体情况。在确保工程质量和进度的前提下,少花钱、办好事。对于投资控制,我们的控制方法是不断将计划值与实际值进行比较,采取组织措施、经济措施、技术措施和合同措施这四个手段来保证目标的实现。11.2.投资控制的内容通过对投资总目标值进行切块分解和在实施过程中各阶段的动态跟踪管理,确保各阶段投资际值不突破计划目标值。(1)审核工程进度款支付及最终核定项目的实际投资;(2)预防和处理施工索赔,工程索赔的审批控制;(3)对工程进度、质量检查、材料检验的监督和控制;(4)对实际完成的分部、分项工程量进行计量和审核。对承包商提交的工程进度付款申请进行审核,并签发付款支付证书以控制合同价款;(5)严格控制工程变更,按合同规定的控制程序和计量方法,确定工程变更价款,及时分析工程变更对控制投资的影响;(6)参与施工合同的调整、补充和洽商工作,着重考虑对投资控制的影响。(7)竣工结算的审查签发。11.3.投资控制的原则1、严格执行建设单位与承包单位双方签订的建筑工程施工合同中所确定的合同价、单位价和约定的工程款支付方法;2、坚持对报验资料不全、与合同文件的约定不符、未经质量签认合格或有违约的工程内容不予审核和计量;3、工程量与工作量的计算符合有关的计算规则;4、处理由于设计变更、合同变更和违约索赔引起的费用增减坚持合理、公正;5、对有争议的工程量和工程款,采取协商的方法确定;6、工程量及工程款的审核在建设工程合同所约定的时限内。11.4.投资控制的基本程序工程计量与支付基本程序ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划监理工程师以分项分部工程已签认承包单位填写《月完成工程量报审表》监理工程师审批承包单位按审批的工程量填写《月付款报审表》、《月支付汇总表》监理工程师审批总监理工程师签发《工程款支付证书》建设单位负责人审批建设单位向承包单位支付设计变更费用合同变更费用索赔费用等 双方协商三方协商修改工程竣工结算的基本程序工程经各方竣工验收合格承包单位提出竣工结算资料监理工程师审核总监理工程师签发《工程结算款交付证书》建设单位审核建设单位向承包单位付款保修阶段结束时进行工程款最终结算同意11.5.投资控制的措施ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划本工程的投资控制工作应着重建立健全监理组织,完善职责分工及有关监理制度,落实投资控制的责任,在审核施工组织设计和施工方案的基础上,合理开支施工措施费,以及按合理工期组织施工,避免不必要的赶工费,及时进行计划费用与实际开支费用的比较分析。严格按合同条款支付工程款,防止过早、过量的现金支付,全面履约,减少对方提出索赔的条件和机会,正确处理索赔等。11.5.1投资的事前控制1.确定投资控制目标,并细分目标值;2.审查施工组织设计和技术措施费用;3.熟悉工程概况、设计图纸和设计要求;4.熟悉设计图纸和设计要求、标底标书,分析合同价构成要素,明确工程费用最易突破的部分和环节,从而明确投资控制的重点。5.预测工程风险及可能发生索赔诱因,制定防范性对策,减少向建设单位索赔的发生。6.督促建设单位按合同规定的条件,按期提交施工现场,使期其能按期开工正常施工,连续施工,不要违约造成索赔条件。7.督促建设单位按合同要求,按期、按质、按量地供应由建设单位负责的材料、设备现场,不要违约造成索赔条件。8.督促建设单位按合同要求,及时提供设计图纸等技术资料,不要违约造成索赔条件。11.5.2投资的事中控制1、按合同规定,及时答复被施工单位提出的问题及配合要求,不要造成违约和对方索赔的条件。2、主动搞好有关本工程各方面的协配合工作,不要造成对方索赔的条件。3、工程变更、设计修改要慎重,事前应进行技术经济合理性预分析,尽量避免增加工程投资。4、凡涉及经济费用支出的停窝工签证,用工签证、使用机械签证、材料代用和材料调价确等,须项目总监理工程师核签后方有效。5、按合同规定,及时对已完成工程计量进行验收,不要造成未经监理方认可就承放其完成数量的被动局面。6、按合同规定,及时审核支付进度款,不要造成违约被处以罚款的条件。7、按有关部门颁布的价格信息,及时掌握国家调价的范围和幅度。8、检查、监督施工单位执行合同情况,使期全面履约。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划9、审核设计变更引起的工程量变更,若属于必须变更的工程量,若增则给承建商以补偿;若减则向承建商扣除,对于前一种情况要从严控制,并特别注意对工期的影响,对后一种情况要特别注意对工程质量的影响,两种情况均作相应的签证和填报,一般情况下应由总监理工程师和业主一起作出决定,现场监理工程师要为此做好核算工作。10、对承建商的付款申请审核,要验工、计价,必要时通过实测复核工程量,对其中虚报或未达到质量要求的部分应予以拒绝,付款单应由总监签证,现场监理工程师要为此做好核算工作。11、根据承包合同所产生的应有支付,监理人员应公正地对待。但监理人员应审核承建商的材料、成品购货单据,实际人工投入数量并与承包合同比较,总监理工程师在此基础上按合同规定的办法对政策性调整引起的付款申请作出签证。12、定期向总监、建设单位报告工程投资动态情况,定期、不定期地进行工程费用超支分析,提出控制工程费用突破的方案和措施。11.5.3投资的事后控制1、审核施工单位提交的工程结算书。A.工程竣工,经建设单位、设计单位、监理单位、承包单位验收合格后,督促承包单位在合同规定的时间内向项目监理部提交竣工结算资料;B.监理工程师及时进行审核,并与承包单位、建设单位协商和协调,提出审核意见(承包单位提交的竣工结算资料存在不实,则要求承包单位重报);C.总监理工程师根据各方协商的结论,签发竣工结算《工程款支付证书》。2、公正处理索赔事项,索赔协议或处理意见由专业监理工程师组织起草,由总监理工程师核签。3、承建商使用不合格或劣质材料、成品引起的问题除从工程质量角度进行监理外,还应对造成的经济损失进行索赔,这一索赔应会同业主、承建商共同商议协定。4、由于承建商引起的延误工期,应按承包合同向承建商提出索赔,随时防范业主的原因造成的工期延长,若确已发生,应该正确处理这种工期延长。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划5、工程竣工后,督促承包单位及时整理与投资有关的资料,进行归类、编目和建档,按有关规定进行资料移交。12、安全与文明管理项目总监理工程师对工程项目的安全监理工作负责。安全监理员在总监理工程师的领导下,开展施工现场日常安全监理工作。12.1.安全与文明施工监理原则12.1.1切实贯彻“安全第一,预防为主”的安全生产方针,严格执行有关安全生产的政策、法令、法规和技术标准。12.1.2严格遵守当地有关主管部门制订的文明施工规范,按照文明工地的标准,规划和管理工地现场。12.1.3对施工的安全与文明保持持续监控,并确保足够的监控深度与力度。严格按照市府有关规定做好安全施工措施,包括设备的安全、人的安全,安全棚、12.1.4安全网、安全帽、出入口。现场文明施工要做好场地整洁、工作面完工做到料清场净,生活及相关地域整洁。12.1.5严防工程建设五大伤害发生率较高:高处坠落、触电事故、物体打击、机械伤害、坍塌事故。安全施工要杜绝:“三违”:违章指挥、违章作业、违反劳动纪律。12.2.安全与文明施工监理的内容12.2.1督促施工承包单位建立、健全施工现场安全生产保证体系;在组织领导、人员配置、岗位责任、管理制度等方面督促健全和落实。督促施工承包单位检查各分包企业的安全生产制度。12.2.2审核施工承包单位编制的施工组织设计、安全技术措施、高危作业安全施工及应急抢险方案是否符合工程建设强制性标准。12.2.3审查承包商提交的施工现场平面布置,督促承包商定期或不定期的检查用电、机械设备、临边防护、消防等安全。12.2.4督促施工承包单位做好逐级安全交底工作。针对性的安全交底和教育是预防事故的必要手段,必须明确施工作业的危险点、安全操作要点、预防与紧急应对的方法等。12.2.5监督施工承包单位按照工程建设强制性标准和专项安全施工方案组织施工,制止违规施工作业。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划12.2.6检查现场地面处理、施工道路、现场排水、施工管线、物料堆放、临时设施等的布置情况(应按施工总平面图实施)。12.2.7检查现场各种标牌(安全纪律牌、安全标志牌、安全标语牌、施工公告牌等)的内容和视觉效果。12.2.8检查各分部分项工程施工安全技术措施和安全防护设施的落实情况。12.2.9对承包商施工机械设备的数量、性能、检修证及特种工种作业人员操作证等进行审核、监督,确保机械设备的正常运转,消除不安全隐患。12.2.10复核施工承包单位施工机械、安全设施的验收手续,并签署意见。未经安全监理人员签署认可的不得投入使用。12.2.11严防工程建设五大伤害发生率较高:高处坠落、触电事故、物体打击、机械伤害、坍塌事故。安全施工要杜绝:“三违”:违章指挥、违章作业、违反劳动纪律。12.2.12安全检查保证六项:安全生产责任制、目标管理、施工组织设计、分部工程安全技术交底、安全检查、安全教育。12.2.13文明检查保证六项:现场围挡、封闭管理、施工场地、材料堆放、现场住宿、现场防火。12.2.14检查季节性(冬期、雨季、台风、高温等)施工安全措施的落实情况。12.2.15对施工过程中的高危作业等进行巡视检查,每天不少于一次。发现严重违规施工和存在安全事故隐患的,应当要求施工承包单位整改,并检查整改结果,签署复查意见;情况严重的,由总监下达工程暂停施工令并报告建设单位;施工承包单位拒不整改的应及时向安全监督部门报告。12.2.16每周对施工现场的安全用电、动用明火、防护设施、消防器材的设置、设备安装、防火、防事故措施的落实情况进行一次综合性的检查;12.2.17督促施工承包单位进行安全自查工作;参加施工现场安全生产检查。12.2.18检查督促承包商按规定做好施工区域与非施工区域之间分隔、路拦的设置。12.2.19检查本工地排水设施,督促封堵排水管道的申报手续及检查督促对公用管线的保护措施和其他应急设施(包括防汛措施)的落实。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划12.2.20检查督促承包商保持施工沿线单位居民的出入口和道路的畅通、整洁,凡在施工道路口要按规定设置交通标志牌,夜间设示警灯,防止事故发生。12.2.21检查督促承包商按规定落实各类材料及土方的堆放,做到整齐有序,不侵占人行道、车行道、消防通道。12.2.22检查督促承包商在施工中防止渣土洒落、泥浆废水流溢、粉尘飞扬,减少施工对市容环境和绿化的污染。12.2.23检查督促承包商按规定做到对工地“五小”设施齐全,建立各项管理制度,落实卫生包干责任制,搞好施工区域和生活区域的环境卫生。12.2.23检查现场在卫生防疫和治安保卫方面执行有关规定和落实保证措施的情况。12.2.25安全监理人员应对高危作业的关键工序实施现场跟班监督检查。12.2.26对检查中发现存在的问题,要以书面通知承包商,落实整改并及时向建设单位反馈。12.2.27工程竣工后,检查督促承包商在规定期限内完成现场的清场工作。12.3.安全管理监理工作程序12.3.1工程建设安全生产监控框图(见框图1)12.3.2、施工安全生产管理基本程序框图(见框图2)12.3.3、施工安全生产监理基本程序框图(框图2)安全生产领导小组ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划一般人员40学时安全教育计划1.施工安全生产教育制度;2.施工安全生产技术措施交底制度;3.施工安全生产检查制度;4.施工安全生产奖惩制度;5.施工安全生产例会制度;6.安全事故报告及处理制度。管理人员120学时建立安全管理制度事故处理组织管理总结提高防止再发生12.3.4施工安全监控程序框图(框图3)施工单位编制施工安全组织设计监理审查修改再报1.安全保证体系是否健全2.安全管理人员是否持证上岗3.安全措施是否符合实际并切实可行审查内容不符合要求施工单位组织实施,专业监理工程师监督检查专业监理工程师编制建立实时方案报总监批准1.人的不安全行为2.机械的不安全状态3.施工用料(爆炸品、易燃品、模板、衬砌台车、脚手架)安全4.施工方法(带电作业、高空作业)是否符合要求5.施工用电安全情况6.不良地质对安全的影响7.其他不安全行为检查内容符合要求不符合要求继续施工1.责令立即进行整改2.紧急情况总监先下停工令后报建设单位3.安全隐患消除并经监理确认后方可恢复施工ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划12.3.5环境保护和水土保持监控程序框图承包单位编制环境保护和水土保持施工措施监理工程师审查承包单位按批准的环境保护和水土保持施工措施组织实施环保监理工程师对实施情况是否符合设计文件及合同要求进行检查1.是否符合国家有关政策2.是否符合设计文件和合同要求3.是否符合现场实际并切实可行1.设计措施是否到位、合理并便于施工2.承包人水保、环保体系建立和运行情况是否符合要求3.承包人废水、弃碴、泥浆、垃圾排放和植被恢复情况继续施工责令整改向建设单位报告请求变更设计符合不符合施工原因设计原因审查内容检查内容容12.4.安全、文明、环境保护监理措施12.4.1工程施工安全、文明、环境保护措施的审定ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划监理在审定施工组织设计方案时,按国家有关政策、法规对施工方提出的安全、文明、环境保护对策与方法进行认真审核,重点是本工程所在位置影响现有构筑物安全、防止大面积地面水平与垂直向变形的监测与应急措施;对原有地下管线安全保护措施以及无意损坏时的应急措施;对绿化景观区以及属保护的树种监护措施;对施工排水、弃土与运土等可能造成环境污染的相关措施等。12.4.2全方位、多环节现场监控安全、文明、环境保护面广、点多,监理从面点结合全方位、多环节进行现场进监控。一是地表、空间检测点分布的合理性、观测记录报告的持续性与及时性。结合现场情况与工点施工进展,根据刘建航院士的“时空效应”现场与“分层、分块、对称、平衡、限时”的施工要求,做好各种检测数据的采集、分析、预控的信息化施工监理以及与之对应抢险措施的审定。二是全方位巡检、全环节跟踪。高空、高危、水上、地下施工等高风险作业,要进行分析、预控、全方位巡检、全环节跟踪。如井点降水、基坑开挖、等施工作业,影响周围环境的现象在地表,问题的实质在地下。由于地层各类土体力学性能、地下水状况尚还存在某些方面的不确定性,我们期望工程施工不发生稳定性破坏与强度破坏,减少工程风险的措施在于事先的对策和事中的监控。有时地表A点的沉降、位移问题出在地下B点经过一定通道而引起,因而树立全方位、多环节现场监控思路很有必要。12.4.3监理的岗位要求监理岗位要求是:“认识到位、责任到位、措施到位”。在安全、文明、环境保护监理工作上,认识上要明确本工程风险的几个主要环节,并对比找到几种抢险、预防对策,在过程中根据可能有不同于原有设想的情况(如地层变化、施工不当等),即时调整检测方案这是动态监理现场工作重要环节。信息化施工一是要在真实信息采集基础上及时进行分析,二是及时采取相应对策,尤其是报警值出现。某些不稳定因素表象(倾斜、位移、裂缝的初始现象)时,效果好坏往往在时控上。12.5.安全与文明施工监理方法ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划安全监理是对工程建设中的人、机、环境及施工全过程进行评价、监控和督查,以实现安全生产、文明施工,将风险控制在允许范围内,确保施工安全性。在具体实施中,确保做到横到边(覆盖全部)、纵到底(人员交底)。12.5.1制订安全监理方案、安全监理措施等文件,以指导本项目的安全监理工作。在监理规划中必须包括安全监理方案,以明确安全监理内容、工作程序和制度措施。监理实施细则中应包含安全监理的具体措施。12.5.2预审:如审查安全生产保证体系、安全技术措施和施工现场临时用电方案、高危项目专项施工方案等。安全生产保证体系的建立必须结合施工企业特点和工程项目的具体情况,并覆盖标准要求。必须形成安全体系文件,以使工作有标准、检查有依据、运行有记录,达到责任明确、岗位落实、管理到位的状态。审核的重点是安全管理的目标、组织结构、资职及安全生产责任制;安全生产及控制检查所必要的设施、设备、防护用品、保险装置、物资保证;针对施工作业风险程度、危险点及关键环节所采取安全技术措施的可靠性与可行性等。分别签署专项安全施工方案(安全技术措施)表‘A1’、分包单位资质审查表‘A3’等。12.5.3检查与验收:对一些安全设施、安全设备必须通过检查与验收,方可施工。签署施工机械、安全设施验收核查表。12.5.4巡视与旁站检查:对安全文明施工的设施、安全设备,应经常巡视、定期检查,发现问题,督促限期整改。对高危作业的关键工序实施旁站监理,现场跟班监督检查。作好检查记录,填写巡视旁站检查表。12.5.5下达《监理通知单》:在实施监理的过程中,发现存在安全事故隐患时,除口头督促整改外,必要时签发《监理通知单》‘规范B1表’,明令整改。整改后审签《整改复查报审表》‘规范A6表’。对情况严重的,应当要求施工单位暂时停工,并及时报告建设单位。12.5.6开好工地例会:把安全及文明施工列入工地例会内容,对存在问题责成解决,并在下次会议上反馈整改结果。12.5.7发布停工指令:在因安全原因出现必须停工处理(某一部位或整个工程)的情况时,与项目法人协调后,发出停工指令‘B1’ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划表,直到停工因素消除后,经核查认可,方可复工。12.5.8安全监理日记:认真写好安全监理日记,记录每天安全监理工作内容及交接注意事项。12.5.9安全监理月报:对当月施工现场安全施工状况和安全监理工作做出评述,报建设单位和施工受监安监站报告工地安全生产情况。12.5.7.危险源的监管要求1、应结合工程特点,及时编制针对性较强的安全技术方案,控制危险源项目实际操作,避免隐患。2、监理单位对本工程危险源进行专项施工方案审批、审查,检查其专项施工方案是否符合工程建设强制性标准;3、监理项目组建立后,将及时编制监理规划,并包含安全监理方案,明确安全监理内容、工作程序和制度措施;编制的监理实施细则将包含安全监理的具体措施;4、安全监理师对危险作业要进行全过程旁站监理;5、安全监理师将参与总承包单位每周组织分包、专业施工等单位按专项施工方案实施安全检查;6、监理组在实施监理过程中,发现存在安全事故隐患的,应要求施工单位整改;情况严重的要求施工单位暂时停止施工,并及时报告建设单位;对施工单位拒不整改或者不停止施工的,监理组应及时向有关主管部门报告。13.合同管理监理单位在工程建设监理过程中,合同管理主要是根据监理合同的要求,对工程承包合同的签订、履行、变更和解除进行监督检查,对合同双方的争议进行调解和处理,以保证合同的依法签订和全面履行。合同结构图合同关系合同关系杭州余杭水务有限公司ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划合同关系杭州南越工程项目管理有限公司杭州路桥公司监理与被监理关系              杭州天下建设有限公司承建商13.1.工程合同管理的内容项目监理机构在本工程的监理过程中,对各类合同条款进行分门别类的认真研究和解释,提出合同的缺陷和弱点,以发现和提出需要解决的问题。同时,更重要的是对引起合同变化的事件进行分析研究,以便采取相应措施。除按合同进行质量控制、进度控制、投资控制外,尚需根据合同进行如下其他事项的管理。13.1.1设计变更、洽商的管理1.设计变更、洽商无论由谁提出和批准,均须按设计变更、洽商的基本程序进行处理;2.《设计变更、洽商记录》必须经监理单位签认后,由总监理工程师签发《工程变更通知》交承包单位执行;3.《设计变更、洽商记录》和《工程变更通知》的内容应符合有关规范、规程和技术标准;4.《设计变更、洽商记录》和《工程变更通知》的填写内容必须表述准确、图示规范;5.设计变更、洽商的内容应及时反映在施工图纸上;6.分包工程的设计变更、洽商通过总承包单位办理;7.设计变更、洽商的费用由承包单位填写《设计变更、洽商费用报审表》报项目监理部,由监理工程师进行审核后,总监理工程师签认;8.除合同明确注明外,设计变更、洽商的工程完成并经监理工程师验收合格后,按正常的支付 程序办理变更工程费用的支付手续。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划13.1.2、工程暂停及复工的管理在下列情况发生时,总监理工程师可以签发《工程部分暂停指令》:1、应建设单位的要求,工程需要暂停施工时;2、由于工程质量问题,必须进行停工处理时;3、为避免安全隐患发生、造成工程质量损失或危及和人身安全时;4、发生必须暂停施工的紧急事件时。13.1.3、在监理合同有约定或必要时,签发《工程部分暂停指令》前,应征求建设单位的意见;13.1.4、在工程暂停经处理达到可以继续施工时:1、如工程暂停是由于建设单位原因,或非承包单位原因时,监理工程师在暂停原因消失,具备开工条件时,及时签发《监理通知》,指令承包单位复工;2、如工程暂时由于承包单位原因,承包单位在具备复工条件时,应填写《复工报审表》报项目监理部审批,由总监理工程师签发审批意见;3、承包单位在接到同意复工指令后,继续施工。4、签发《工程部分暂停指令》后,监理工程师协同有关单位按合同约定,处理好因工程暂停所引发的各类问题。13.1.5、工程延期的管理 项目监理部对合同规定的下列原因造成的工程延期事件给予受理:1、非承包单位的责任使工程不能按原定工期开工;2、工程量变化和设计变更;3、非承包单位原因停水、停电(地区限电除外)造成一周内停工累计超过8小时;4、国家和地方有关部门正式发布的不可抗力事件;5、建设单位同意工期相应顺其它情况。13.1.6.项目监理部只在以下情况受理承包单位提出的工程延期申请:1、工程延期事件发生后,承包单位在合同约定期限内提交了工程延期意向报告;ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划2、承包单位按合同约定提交了有关工程延期事件的详细资料和证明材料;3、工程延期事件终止后,承包单位在合同约定的期限内,提交了《工程延期申请表》;4、在工程延期事件发生后,项目总监理工程师做好以下工作:5、向建设单位转发承包单位提交的工程延期意向报告;6、对工程延期事件随时收集资料,并做好详细记录;7、对工程延期事件进行分析、研究,对减少损失提出建议;8、监理工程师在处理工程延期的过程中,书面通知承包单位采取必要的措施,减少对工程的影响程度。13.1.7.监理工程师审查承包单位提交的《工程延期申请表》:1、、申请表填写齐全,签字、印章手续完备;2、证明资料真实、齐全;在合同约定的期限内提交。13.1.8.监理工程师评估延期的原则:1、工程延期事件属实;2、工程延期申请依据的合同条款准确;3、工程延期事件发生在被批准的进度网络计划的关键线路上。4.最终评估出的延期天数,在与建设单位协商一致后,由总监理工程师签发《工程延期申批表》。5、监理工程师按施工合同中对处理工程延期的各中时限要求处理。13.1.9费用索赔的管理项目监理机构费用索赔的主要任务:1、对导致索赔的原因有充分的预测和防范;2、通过有力的合同管理防止干扰事件的发生;3、对已发生的干扰事件及时采取措施,以降低它有影响及损失;4、参与索赔的处理过程,审核索赔报告,反驳承包单位不合理的索赔要求或索赔要求中不合理的部分,使索赔得到圆满解决。13.1.10ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划承包单位无法预见的不利自然条件(达到合同专用条款约定的标准时)造成的施工费用增加,按程序进行处理。13.1.11非承包单位原因引起的费用索赔:1、设计图纸;2、未按合同规定和经批准的施工进度及时提供施工场地而引起承包单位费用增加。3、提供的红线控制桩和放线资料不准确;4、由于国家法律的更改而引起的费用增加。13.2.工程合同管理的原则项目监理机构采取预先分析、调查的方法,经常跟踪合同执行情况和施工中问题,及时通过《监理通知单》督促和纠正承包单位不符合合同约定的行为和提前向建设单位和承包单位发出预示,防止偏离合同约定事件的发生。13.3.合同管理的程序13.3.1、设计变更、洽商的基本程序承包单位、设计单位、建设单位任何一方提出设计变更、洽商承包单位、设计单位、建设单位任何一方提出设计变更、洽商总监理工程师签发《工程变更通知》承包单位按《工程变更通知》施工承包单位提交《设计变更、洽商费用报审表》监理工程师审核总监理工程师签认意见建设单位审批同意不同意ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划13.3.2、工程延期管理的基本程序延  期  事  件  发  生承包单位提交工期索赔意向报告承包单位随时提交延期事件的详细报告延期事件结束、承包单位提交《工程延期申请表》项目监理部收集资料详细记录过程监理工程师审核与评估与承包单位、建设单位协商总监理工程师签发《工程延期申请表》不一致不同意13.3.3、费用索赔管理的基本程序费 用 索 赔 事 件 发 生承包单位提交费用索赔意向报告承包单位随时提交延期事件的详细报告延期事件结束、承包单位提交《费用索赔申请表》项目监理部收集资料详细记录过程监理工程师审核与评估与承包单位、建设单位协商总监理工程师签发《费用索赔审批表》不一致不同意ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划13.3.4、合同争议调解的基本程序争  议  发  生争议一方或双方提交解决争议申请总监理工程师协调并作出处理决定合同争议解决双方满意向仲裁委员会申请仲裁或直接向法院起诉执行仲裁委员会的裁决或法院判决双方不同意13.3.5、违约处理的基本程序违约事件发生项目监理部调查、确认违约性质监理工程师评估违约方给对方造成的费用增加或工期延误与双方协商处理意见总监理工程师签发凭证ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划13.4.合同管理的措施13.4.1、订本工程项目合同体系及合同管理制度,包括合同草案的拟订、会签、协商修改、审批、签署、保管等工作制度及流程。13.4.2、助业主拟订项目的各类合同条款,并参与各类合同的商谈。13.4.3、合同执行情况的分析和跟踪管理。13.4.4、协助业主处理与项目有关的索赔事宜,调解合同纠纷。14、组织协调工作在工程项目的实施过程中,监理工程师要不断进行组织协调,它是实现项目目标不可缺少的方法和手段。协调的目的就是为了实现目标。14.1、组织协调的工作内容组织协调包括项目监理组织内部人与人、机构与机构之间的协调;项目监理组织与外部环境组织之间的协调,包括:14.1.1、协调业主和设计单位以及工程建设有关的其它单位之间的关系;14.1.2、协调业主与承建商之间的关系;14.1.3、协调总包商与材料、设备供应单位之间的关系;协调总包商与分包商之间的关系。14.2、组织协调工作的重点项目监理机构组织协调工作主要做好以下工作:14.2.1、ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划由总监理工程师抓好监理机构组织关系和人际关系的协调,在工作委任上要量才录用、职责分明,明确岗位职责和权限,对组织成员的成绩评价实事求是,采取工作专题会议、碰头会、组织学习等形式进行相互沟通,提高员工的工作积极性,激励项目监理机构成员。14.2.2、在与业主的协调上,要领会、理解业主的要求和意图,主动协助业主处理工程中的事务性工作,促进监理与业主双方工作的协调一致;尊重业主,在执行业主的指令时尽量避免发生误解或冲突,使工程顺利实施,让业主满意。14.2.3、在与施工单位的协调上,要坚持原则、实事求是,讲究科学的态度,向施工单位灌输各方面利益的一致性和工程建设的总目标;在不违反原则的前提下对施工工作提出指导性的意见或施工单位可接受的变通方法;14.2.4、在进度问题上的协调,要控制好业主和施工单位双方共同商定得到一级网络计划,按网络计划的关键节点进行进度考核,并提出奖罚措施。14.2.5、在质量问题上的协调,要在坚持原则的前提下,加强事前控制检查工作,对存在问题及时发现及提醒施工单位,避免因事后返工给施工单位造成经济和工期上的损失;对工程量的审核要以事实为依据,做好前期的实测签证工作;对施工单位违反规范的行为或工程质量出现问题时,要及时制止和处理,并明确时间期限。14.2.6、在出现合同争议时,监理工程师尽量采取协商解决的方法,一些较棘手的合同争议,在不影响进度、质量的前提下,可暂时搁置,另谋良策。14.2.7、在与设计单位的协调上,要尊重设计单位意见,发现设计问题,及时协助业主向设计单位提出,避免造成大的损失;对设计变更等信息的传递要及时传达到施工单位,对施工过程中的施工变更,要主动配合设计单位及时处理。14.2.8、与政府部门的协调,在处理工程质量问题上要做好与工程质量监督站的交流,并配合质量监督站做好对工程的检查验收工作,及时向其反馈工程质量方面的信息,取得其对监理工作的支持。14.2.9另外,根据本工程所处地理位置,还要配合业主、施工单位做好与当地居民的协调工作,减少周边环境对工程施工的干扰,加快施工进度。14.3、协调工作的方法ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划14.3.1、会议协调法,如第一次工地会议、监理例会、专题性协调会议等。14.3.2、交谈协调法,对一些小的问题不需要开会解决,通过与有关方面的口头交谈及时处理落实。14.3.3、、书面协调法,对一些协调内容有一定合同效力的监理通知、工作指令、报告、联系函、会议纪要等,采取书面协调方法可避免以后的意见分歧。15、监理工作制度为确保监理工作正常有效,本工程遵从以下各项监理工作制度,总监理工程师负责各项制度的落实。15.1、设计交底与施工图纸会审制度开工前,在收到设计文件、图纸后,项目监理组参加由建设单位组织的设计交底和施工图纸会审,使监理工程师、施工单位了解工程特点和设计意图,以及对关键部位、新材料、新工艺、新技术的质量要求、做法、注意事项能切实理解,避免图纸中的错、漏、碰、缺。15.2、施工组织设计(方案)审核制度工程开工前施工单位项目经理填报“施工组织设计(方案)报审表”,并附施工组织设计(方案)报监理工程师审核,监理工程师审核批准后,报总监理工程师审批,同意后施工单位方可进行施工。15.3、工程开工申请制度在各项准备工作已完成,具备开工条件后,向监理工程师提交“工程开工报告”经监理工程师核实,认为确实具备开工条件后,报总监理工程师及建设单位审批,由总工程师签署开工意见。15.4、工程材料、成品、半成品质量检验制度在检验批施工前,监理工程师应严格审核进场原材料和构配件及设备的质保资料,如合格证、准用证、试验报告等,阻断材料、钓钩材料、龙骨材料及装饰材料(石材、玻璃、金属扣板、油漆等)见证取样、检验并根据工程实际要求进行样品封存,合格后方准使用。15.5、隐蔽工程、检验批、分项、分部工程质量验收制度ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划(1)在隐蔽以前,承包单位应按各专业工程施工质量验收规范进行自检,并将自检资料附报验单在验收3天前提交监理工程师认可,经隐蔽工程验收合格后方可进入下道工序施工,重点部位或项目应会同建设和设计单位共同验收签认。(2)检验批施工完毕,施工单位应按各专业工程施工质量验收规范进行自检,并填写“检验批质量验收记录”报专业监理工程师,专业监理工程师按主控项目、一般项目和质量检查记录进行验收,并签署验收结论。(3)分项工程施工完毕,施工单位自检合格后,填写“分项工程质量验收记录”,报专业监理工程师,监理工程师按所含检验批的质量验收记录进行分项工程验收,并签署验收结论。(4)对部份工程分部、设备安装分部等工程,施工单位还应将有关安全性、功能性测试记录和抽样检测结果及观感质量验收以及单机无负荷试车记录报监理工程师,监理工程师应对质量控制资料和分部工程进行检查,在资料齐全和现场具备验收条件的基础上,报总监理工程师批准后,由总监理工程师组织建设、设计、施工等单位项目负责人进行验收。15.6、工程变更复核签审制度(1)设计单位对原设计存在的缺陷提出的工程变更,应编制设计变更文件;建设单位或施工单位提出的工程变更,应提交总监理工程师,由总监理工程师组织专业监理工程师审查,审查同意后,应由建设单位转交原设计单位编制设计变更文件。当工程变更涉及安全、环保等内容时,应按规定经有关部门审定。(2)项目监理组应了解实际情况和收集与工程变更有关的资料。(3)总监理工程师必须根据实际情况,设计变更文件和其他有关资料,按照施工合同有关条款,在指定专业监理工程师完成下列工作后,对工程变更的费用和工期作出评估。①确定工程变更项目与原项目之间类似程度和难易程度。②确定工程变更的工程量。③总监理工程师应就工程变更费用及工期的评估情况与施工单位和建设单位进行协调。④总监理工程师签发工程变更单。15.7、工程质量事故处理制度ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划监理工程师发现施工存在重大质量隐患,可能造成质量事故或已经造成质量事故时应通过总监理工程师及时通知建设单位,获同意后下达工程暂停令,要求施工单位停工整改。整改完毕并经监理人员复查,符合规定要求后,总监理工程师应及时签署工程复工报审表。总监理工程师下达工程暂停令和签署工程复工报审表,应事先向建设单位报告。对需返工或加固补强的质量事故,总监理工程师应责令施工单位报送质量事故调查报告和经设计单位等相关单位认可的处理方案,项目监理组应对质量事故的处理过程和处理结果进行跟踪检查和验收。15.8、施工进度监督及报告制度(1)监督施工单位严格按照已批准的总进度计划,月进度计划组织实施,监理工程师以《监理月报》形式向建设单位报告分项工程实际进度及计划进度的对比和形象进度情况。(2)审查施工单位编制的施工进度计划,要突出重点,个单位、各工序衔接紧密。15.9、监理报告制度(1)监理月报:监理工程师每月末编制《监理月报》,内容包括工程质量分析、施工进度情况分析、人员动态、本月监理工作小结及下月监理工作打算等内容,编制完成后报建设单位、公司工程监理部各一份。(2)工程质量评估报告:装饰分部、安装分部验收完成后,监理工程师应编制《工程质量评估报告》对工程质量进行客观、准确的评价,编制完成后报建设单位一份。15.10、工程例会及会议纪要签发制度(1)工程例会是履约各方沟通情况,协调解决工程中存在问题的会议。由总监理工程师主持召开。(2)工程例会召开次数根据工程的进展程度及工程实际确定,宜每周召开一次。(3)工程例会会议纪要由指定的监理人员整理、打印,应真实、简明、扼要,总监理工程师审核后发放到有关各方,有关各方应履行签收手续。15.11、竣工预验制度施工单位完成全部合同、设计文件规定的内容,在自检合格的基础上,将竣工资料及联动无负荷试车记录报监理工程师审核,并提出“预验申请”,监理工程师在确定资料齐全、现场具备验收条件的基础上,提请总监理工程师及公司总师室、工程监理部。由总师室、工程监理部组织项目监理组进行竣工预验收。15.12、项目监理内部工作制度(1)监理日记制度。由监理工程师协助对每天现场情况进行记录,主要包括天气情况、现场施工、人员动态、各方指示、材料进场与试验、每日监理工作等内容。(2)监理内部会议制度。监理内部会议主要目的是使监理人员相互沟通、交流情况,解决监理工作中存在的问题。会议由总监理工程师主持,一般每月进行一次。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划15.13公司对项目监理组的管理活动制度(1)公司工程监理部定期对项目监理组及总监理工程师服务的工作质量进行考核与检查,并听取建设单位意见。(2)公司监理部不定期检查工程质量,参与对装饰、安装工程的验收。(3)公司总师室与竣工工程的验收,并协助解决工程监理中较复杂的技术问题。(4)公司经营部阶段性向业主发放《征询单》听取业主意见后,以使项目监理组提高服务质量。(5)公司每年组织力量对工程部和项目监理组进行内部质量审核,提出改进措施。(6)公司领导层每年召集各部门进行管理评审,研讨改进各部门及项目监理组服务工作的管理。附表:项目监理部管理职能分配表质量管理细目职能要求责任人执行人检验要求监理组织机构基本情况机构设置、资质、授权书、监理规划、监理细则、监理中标书总监总监、总监代表有合乎规范文件、审核手续文件控制记录控制(1)编制记录本部门受控文件。(2)根据记录编目,用正确表示和标式编制监理类、贯标类文件。(3)按照要求移交存档。总监代表资料员受控文件清册文件收发记录记录编目质量管理细目职能要求责任人执行人检验要求管理职责(1)学习贯彻公司质量方针、目标,以及国家和市颁布的新文件新规范。(2)各监理人员全面正确履行职责。(3)加强与业主和施工方沟通,协调。(4)及时向公司提供监理信息和合理化建议。(5)对不合格服务项,有及时纠正的措施和今后预防的措施。总监总监总监代表学习会议记录。监理录用的信息制定纠正和预防措施。资源管理(1)根据工程部统一安排,对人员实行内、外培训。总监总监总监代表内、外培训完成情况。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划(2)根据工程进度,及时调配人力资源。(3)现场标准化符合实用、简约原则。人员培植合理、无浮员。必须上墙有:本公司质量方针、目标,人员岗位职责,廉政规定,晴雨表、工程进度及实际进度。生产和服务提供的控制(1)按照监理合同的要求,提供生产服务。(2)巡视、督促日常监理工作、协助解决工程技术难点,参与质量安全检查  及质量、安全事故的分析、调查处理。(3)根据质量管理要求,做好监理日记、旁站记录、检查批、工程报验、监理日记、工程阶段性的和竣工评估报告。(4)对工程材料、构配件、设备、分包单位、特种作业人员的监控。(5)定期召开工程例会。总监代表全体监理人员监理日记、旁站记录、监理月报、工程例会纪要。工程材料、构配件设备等应有试验报告或进沪准用证。监理日记、旁站记录联系单必须有封闭措施或未能封闭的原因记录测量、分析和改进(1)监理组配置常规所需的检测设备均有市检测机构的认可证书。(2)配合经营部搜集监理服务质量和满意度分析的资料。(3)配合工程部开展内部审核。(4)贯彻PDCA循环工作法(即筹划—实施—检查—处置)总监总监总监代表、资料员检测设备记录。监理月报定期有此类的信息。每季度一份简要总结(内容:本季度工作主要存在问题、下季度主要针对性措施,在日常监理中必须加强和检查的方面,使工程处于受控状态)不合格品的控制(1)监理文件发文正确,合乎程序、封闭及时,能全面反映建立工作的过程。(2)建立行为符合建设工程的法律、法规。总监总监总监代表、不合格品的出现应控制在一般不合格的范围。不合格品服务处理单。ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73n杭州市余杭区文一西路至瓶仓大道D800供水管道应急工程监理规划ascorrosion,damp;information,instructions,drawingsarecomplete.5.1.3.2.2install(1)civilengineeringconstructioniscompleted,cabinetbase,bracketinstalled,meetsthedesignrequirements;(2)airconditioningsystemsinstallationfinished,undernormaloperatingconditions,indoortemperatureandhumidityreachsystemrequirements;(3)powerandinteriorlightingisputintonormaloperationofthesystem;(4)finishedconstructionofthegroundingsystem,groundingresistancemeetsthedesignrequirements(lessthan4ohms).5.1.3.2.3instrumentenclosureusingboltsbasedontheweldisstrictlyprohibited.InstrumentdisccabinetinstallationofallowsdeviationseeXiatable:instrumentdisccabinetinstallationofallowsdeviationprojectallowsdeviation(mm)verticaldegrees<1.5leveldeviationadjacenttwodisctopDepartment<20%columndisctopDepartment<5discsurfacedeviationadjacenttwodiscside<10%columndiscsurface<5discindirectsewing<25.1.3.2.4internalcablelayingwiring(1)controlroominternalcableincludinggroundingline,andsignalline,andpowerlineanddedicatedcable,wiringrequirementsneatlybeautiful,andlinestandardspecificationsconsistent,wiringrightfirm;(2)checktheintrinsicallysafecircuit,confirmwiththesystemcableandterminalblockofthecolor(usuallyblue)meettherequirements,connectionofintrinsicallysafecircuitsshallensurethatsafeareasisolatedfromthedangerzone;(3)safetygrounding,earthingaccordingtodesigndrawingsandsystemtechnicalrequirementsforconstruction,equipmentgrounding...HardwarechecksatthefactorysetDIPswitchpositionshouldberecordedandthehardwareaddressswitch,swapcardsmustnotdirectlytouchtheelectronic73
查看更多

相关文章

您可能关注的文档